Laserfiche WebLink
CH2M HILL <br /> 155 Grand Avenue,Suite 1000 <br /> Oakland,CA 94612 <br /> SEP 2 3 2002 P.O.Box 12681 <br /> Oakland,CA 94604-2681 <br /> CH2MHILL ARQNMENT HEALTH <br /> 1'c�MIT/SERVICES Tel 510.251.2426 <br /> Fax 510.893.8205 <br /> September 19, 2002 <br /> San Joaquin County Environmental Health <br /> Attention: Jeffrey Wong <br /> 304 E. Weber,3=d Floor <br /> Stockton,CA 95202 <br /> Re: Transmittal of the McMullin Dehydrator Station Implementation Planfor Issuing of Public Notice <br /> Dear Mr..Wong: <br /> I appreciate speaking with you on September 18th. Please find enclosed a copy of the <br /> Implementation Plan (IP) for PG&E's McMullin Dehydrator Station, at 26250 South Airport <br /> Way in Manteca,San Joaquin County, California. As discussed in our phone conversation and <br /> included in the IP, Excavation at the McMullin Station is proposed to remediate near surface <br /> soil and groundwater containing petroleum hydrocarbons. We anticipate this project will begin <br /> in the field on or about October 7,2002 and should take approximately one month to complete. <br /> If we see any major changes forthcoming in the schedule,we will advise you in advance. <br /> This construction is being performed voluntarily by PG&E under the authority and with the <br /> agreement of the Central Valley Regional Water Quality Control Board (CVRWQCB). Please <br /> contact either Mary Serra at the CVRWQCB (916) 255-3082 or me at (510) 251-2888, extension <br /> 2059 should you have any questions or require additional information for issuing your Public <br /> Notice. <br /> Sincerely, <br /> CH2M HILL fu� <br /> Diane Sarmiento,PE <br /> Project Manager <br /> cc: Mary Serra/Central Valley Regional Water Quality Control Board <br /> Bob Noyes/CH2M Hill <br /> Julie Spahn/CH2M Hill <br /> Enclosures (Implementation Plan: one copy) <br />