Laserfiche WebLink
JP UNIFIED PROGRAM CONSOLIDATED FOa <br /> UNDCRCROUND STORAGE T.,%-NK <br /> MONITORING PLAN (Page2of2) <br /> VI.UNDER DISPENSER CONTA_ AILNT <br /> (UDC)MO�IITOY2ING <br /> MONITORLNG IS PERFORMED USING THE FOLLOWING METHOD 494644 <br /> 1.CONTINUOUS ELECTRONIC MONITORING 2, 490-54b <br /> ❑ � FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑ 4.NO DISPENSERS ❑",OTHER(5pS ): <br /> PANEL MANUFACTURER; 490.5;4 EI#: � 490-56. <br /> LEAK SENSOR MANUFAC IZER: �� �r �- 497 I DEL s — -� <br /> Q � ): 494 se <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMSa.YES ❑b NO 49039 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN / �'a,yES ❑b.NO 460 <br /> FAIL(IRE/DISCONNECTION OF U MONITORINO 3Y3TEM TRIGGERS AUT OMATIC PUMP Nti j'DOWN. AS'a-YES ❑b.NO °9w 1 <br /> UDC MONITORING STOPS THE FLO OF PRODUCT AT THE DISPENSER. <br /> YES ❑b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS L SINGLE- ALLED Q 2.I)OUBLE-WALLED a cMt <br /> IF DOUBLE WALLED: <br /> UDCINTERSTITIAL SPACE IS MONITORED BY: ❑ 1.LIQUID 2.PRESSURE...._�_ [13.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRltl(:Pps AUDLBLE.kNo 1,11, <br /> 'PAL ALARMS ❑17E o.NO „o•+� <br /> VII•PERIODIC SYSTEM TESTING <br /> I. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES'CONTROL BOARD THAT ENHANrED 490.65. <br /> __,�_{� Al:DET � Qh1 T U MUST BE PERFORMeD, PERIODIC ELD IS PERFORMED EV r_KY 3.6 MONT14S AS REQUIRED.(23 CCR§2644.1) <br /> -- <br /> ,I IF2._SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49pbti <br /> 3.SPILL BUCKEY ARE TESTED ANNUALLY. W '"-` '� - -• <br /> J00-p)_ <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintetlaneo records are kept for this facility: <br /> lop 490.68a �Nisual Inspection Records 490-68b Tank integrity tossing rcoulta 49oKi& <br /> SIK tesung restilrs(and supporting documentation records), a9a6sd ❑:Taal gauging results(and supporting documentation records). 49a6Sc <br /> ATG Testing results(end supporting documentation records),494 68f ❑ COmsion Protection 60-day lobs 49o.4t <br /> Equiptnetu maintenance and calibration records. 490-osh <br /> DL TRAINNG <br /> ❑Personnel with UST monitoring responsibilities are familiar with all of the following documents rctevant to their lob duties. 490,694 <br /> PEFERENfCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> Q THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Requited)49p-69b <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)4w.69c <br /> CALIFORNIA ITNrWRC,ROUNp STOILAGE TANK REGULATIONS 4vrova <br /> CALIFORNIA UNDERGROUND STORAGE TANK LAW 490.694 <br /> STATE WATER RLSOURCES CONTROL BOARD (SWRCB) PUBLICATION: `HANDBOOK FQR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"4w.69 <br /> ❑ SWRCU PUBLICATION:"UNDERSTANDING AUTOMATIC TANKGAUGNG SYSTEMS"490.698 <br /> ❑ OTHER(Specify):m69h,M69i <br /> This facility has e'`Dcsip�rated UST Operator who has passed the California UST Sy�tcm Opt"tor E.•t,zt ad wrcd by the lntcr ticuazl Code Cotatcll(ICGj. <br /> mt "D i�u:rtcd U5T Operator will train feciliry employees in the proper operatioa and mainte nano of the UST systerns annually,and within 30 days of hire.This <br /> training will include,lout isnot linited to,the following; <br /> L Operation of the UST systems in a manner cortSistent with the facility's best management practices <br /> The f'cility eatployoc's role with cbws to ehc monitoring equipment as aprcified in this UST Monitoring Plan <br /> Y The facility employee's role with regard to spills and ovcrtills ss specified in rhe UST Response Plan f <br /> Names of contact person()for emergencies and monitoring alarms.490.70 <br /> X COXVENTS/ADDXTIONAL INFORMATION <br /> Provide additional commetus here or indicate many pages with additi n0- info uon no . <br /> PP—C— �F��'���� r �i are art hod tp this p 9a�71 <br /> L PER.SO"EL.RESPONSIBILITIES. <br /> tBe UST Owner/Operator is responsiblcfor ensuring that 1)the daily/routine UST monitoring acuvitim and num tor1snce of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release arc investigated,and 3)all monitoring records arerttalntlamed properly. <br /> Tho following person(s)ar MPO ibI f r ertbrming the monitoring and equipment mairn[enancc: ` <br /> NAME P_ 49a7z TITLE Q LGt .� <br /> NAME 490-74 TITLE 49473 <br /> The Desi Icd O 490.75 <br /> Operator shall perform a monthly visual inspoction of the facility,provide a rem to the own oomtor, and inform the owner/oPerwor of any <br /> coruiitiom that nccd follow-up tum. <br /> 'I <br /> C1rRTIFIf ATION; O Vj�E�/OPZ'' TO SIGNATURE <br /> [c=ti hat the information pruvid-vd h=in is rrue and accurate[O the best of my knowledge. <br /> =APPLICANT <br /> IGNATURE 490-16 DATE: <br /> 490.77 <br /> omAME(print); /� � 49G-.78 APPLICANT TITL) : 490-79 <br /> UNCF UST•D(1202047)3/4 <br /> 60/EO 39Hd 000d Sd9 3ND V 9L9LEE860Z TO :ZO 6002/80/0z <br />