Laserfiche WebLink
CypU�Gl9 <br />STATE OF CALIFORNIA <br />STATE WATER RESOURCES CONTROL BOARD s <br />UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br />• C�I,Fp�N.� . <br />COW= I r m ar rnnn I r r vn m run EA CK i Ann a r a i Em. <br />MARK ONLY 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br />ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br />DBA OR FACILITY NAME WHERE TANK IS INSTALLED: ) <br />I. TANK DESCRIPTION COMPLETE ALL ITEMS – SPECIFY IF UNKNOWN <br />A OWNER'S TANK I. D. M ik <br />B. MANUFACTURED BY: <br />C. DATE INSTALLED (MO/DAYNEAR) <br />D. TANK CAPACITY IN GALLONS: S , <br />II. TANK CONTENTS IF A-1 IS MARKED, COMPLETE ITEM C. <br />A. 1 MOTOR VEHICLE FUEL ❑ 4 OIL <br />g. <br />C to REGULAR UNLEADED ❑ 3 DIESEL ❑ 6 AVIATION GAS <br />❑ 1b PREMIUM UNLEADED E::]4 GASAHOL ❑ 7 METHANOL <br />El 2 PETROLEUM El EMPTY <br />PRODUCT <br />❑ 1c MIDGRADE UNLEADED ❑ 5 JET FUEL ❑ 8 M85 <br />❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN <br />❑ 2 WASTE <br />❑ 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br />0. IF (A.1) IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C. A. S. #: <br />III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A, B, AND C, AND ALL THAT APPLIES IN BOX D AND E <br />A. TYPE OF <br />1 DOUBLE WALL <br />❑ 3 SINGLE WALL WITH EXTERIOR LINER <br />❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br />SYSTEM <br />❑ 2 SINGLE WALL <br />❑ 4 SINGLE WALL IN A VAULT <br />❑ 99 OTHER <br />B. TANK <br />1 BARE STEEL <br />❑ 2 STAINLESS STEEL <br />❑ 3 FIBERGLASS <br />❑ 4 STEEL CLAD W/ FIBERGLASS REINFORCED PLASTIC <br />MATERIAL <br />❑ 5 CONCRETE <br />❑ 6 POLYVINYL CHLORIDE <br />❑ 7 ALUMINUM <br />❑ 8 100% METHANOL COMPATIBLE W/FRP <br />(Primary Tank) <br />❑ 9 BRONZE <br />❑ 10 GALVANIZED STEEL <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />C. INTERIOR <br />❑ 1 RUBBER LINED <br />❑ 2 ALKYD LINING <br />❑ 3 EPDXY LINING <br />❑ 4 PHENOLIC LINING <br />LINING OR <br />❑ 5 GLASS LINING <br />❑ 6 UNLINED <br />95 UNKNOWN <br />❑ 99 OTHER <br />COATING <br />IS LINING MATERIAL COMPATIBLE WITH 1009,6 METHANOL? <br />YES _ NO— <br />DETECTOR <br />D. EXTERIOR <br />❑ 1 POLYETHYLENE WRAP <br />❑ 2 COATING <br />❑ 3 VINYL WRAP <br />U 4 FIBERGLASS REINFORCED PLASTIC <br />CORROSION <br />PROTECTION <br />❑ 5 CATHODIC PROTECTION <br />❑ 91 NONE <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />E. SPILL AND OVERFILL, BtC. SPILL CONTAINMENT I <br />DROP TUBE YES <br />TALLED (YEAR) OVERFILL P VENTION EQUIPMENT INSTALLED (YEAR) <br />NO STRIKER PLATE YES NO DISPENSER CONTAINMENT YES NO <br />IV. PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND, BOTH IF APPLICABLE <br />A. SYSTEM TYPE <br />A U <br />1 SUCTION <br />A 0 2 PRESSURE A U <br />3 GRAVITY A U <br />4 FLEXIBLE PIPING A U 99 OTHER <br />B. CONSTRUCTION <br />A U <br />1 SINGLE WALL <br />A o1 2 DOUBLE WALL A U <br />3 LINED TRENCH A U <br />95 UNKNOWN A U 99 OTHER <br />C. MATERIAL AND <br />A U <br />1 BARE STEEL <br />A U 2 STAINLESS STEEL A U <br />3 POLYVINYL CHLORIDE (PVC)A U 4 FIBERGLASS PIPE <br />CORROSION <br />A U <br />5 ALUMINUM <br />A U 6 CONCRETE A U <br />7 STEEL W/ COATING <br />A U 8 100% METHANOL CO ATIBLE W/FRP <br />PROTECTION <br />A U <br />9 GALVANIZED STEEL <br />A U 10 CATHODIC PROTECTION <br />A U 95 UNKNOWN <br />A U 99 OTHER 14 D <br />D. LEAK DETECTION <br />MECHANICAL LINE LEAK <br />❑ <br />2 LINE TIGHTNESS CONTINUOUS INTERSTITIAL 4 ELECTRONIC LINE <br />5 AUTOMATIC PUMP <br />❑ 99 OTHER <br />DETECTOR <br />TESTING MOMTORING <br />LEAK DETECTOR <br />SHUTDOWN <br />V_ TANK LEAK nFTFCTION <br />❑ VISUAL CHECK ❑ 2 MANUAL RECONCILIATIONINVENTORY ❑ 3 MONIITORING OZE EZ' 4 AUTOMATGAUGING IC TANK ❑ 5 GROUND MONITORING TER ❑ 6 TETANK <br />STING <br />CONTINUOUS <br />MONITORING INTERSTITIAL E]8 SIR ❑ 9 WEEK LY MANUAL E]10 MONTHLY TANK ❑ 95 UNKNOWN ❑ 99 OTHER <br />VI. TANK CLOSURE INFORMATION (PERMANENT CLOSURE IN-PLACE) <br />1. ESTIMATED DATE LAST USED (MO/DAYNR) 2. ESTIMATED QUANTITY OF 3. WAS TANK FILLED WITH YES ❑ NO ❑ <br />SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br />THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY, AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br />TANK OWNER'S NAME DATE <br />(PRINTED d SIGNATURE) <br />LOCAL AGENCY USE ONLY THE STATE I.D. NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br />COUNTY # JURISDICTION # FACILITY # 00314P TANK # O <br />STATE I.D.4 m = jA3jij4joj6-jO S D q - <br />PERMIT NUMBER PERMIT APPROVED BYIDATE PERMIT EXPIRATION DATE <br />THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION • FORM A, UNLESS A CURRENT FORM A HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS. THIS FORM <br />SHOULD BE ACCOMPANIED BY A PLOT PLAN. FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STORAGE TANK REGULATIONS I A <br />FORM (6-95) <br />