Laserfiche WebLink
ECEIVEF. <br /> UNDERGROUND STORAGE TANK �� 0 1 <br /> RESPONSE PLAN -PAGE 1tlucility) <br /> TYPE OF ACTION _*1.NF.W PI.AN ❑ 2.CHANOF OF INFORMATION QR ENT Rol <br /> EALTH <br /> I. FACJUTx'WFOI TIOX <br /> FACILITY ID# ( <br /> Agency Use Only) <br /> &BIZINESSAvEmFAL1AEj <br /> BUSINESS T Y � sere. <br /> PRBO � stud, CITY RO;, <br /> II. S '1T ,�1VT'�tOI ASVD CLEANUP MTOI?S <br /> This plat]addresses unauthorized releases from UST systems and supplements the cmergcucy response plans and prOcedureg in the facility's Hazardous Materials <br /> Business Plan. <br /> Y If safe to d0 so,facility ptsrsonnel will take imiy"jate Ine sures to control nr ctnp any rata t .g.,i,etivate pump e.hut oif.eto.)md,if i)oQoauury,oafUy remove <br /> tr <br /> reaining hazardous material from ole UST system. <br /> A Any tvleasd to secondary contairurent will be pumped Or Otherwise removed within a time consistent with the ability of the swondaty comaintnent system to <br /> cant=the hacardous material,but not greater than 30 calendar days,of sooner if required by the local agency. Recovered hazardous materials,unless$till suitable <br /> for their;ntnodnd use,un It be manaWA a hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazard=materials. Absorbent mattriAl which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as huardous waste unless A waste determination in auordance with 22 CCR W262,I1 finds that <br /> r it is non-haz rdoui. Used absorbent material,reusable or waste, will be stored in a properly labeled slid sealed-xZaLdjar Waste nharerial rh ilt b�diTocad <br /> appropriately, <br /> Fatality P=01111e1 will determine whether any water removed from secondary containment systetils, ur from clean-up activity, has been in contact with Any <br /> It p ha=dous material,if the water is contarllindted,it will be managed as hazardous waste urdess a waste determination in accordance with 22 CCkt§66262,11 fuids <br /> i' °• j the[it i�non-ha�ardoUF. 1'f dtd wvter revs a �trOlnum choon r, <br /> rainbow colors),it is G+iutauwtutul. A thick:lYtradng pctroteurlt layer may not nccgasanly display <br /> rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc,will not be disposed to storm water sysicau, <br /> Y We will review secondary containment systalas for possible dGICt'iOmilon if any of the following conditions Occur: <br /> I. HAZAMOus material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2, Sowudary cuntuinment is prone to damage firm tiny equipment used W rerhlove or clean up hazardous mueriai collected in secondary contairhmpnt: <br /> 3. Hazardous material,other than the product/waste stored in the primary containmr.nt system is placed inside secondary containment to iref[or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment, <br /> W., a;YILLA,'ONTROL AND CLEAN-UP EQWNW T s <br /> PERIODIC MAINTENANCE Spill control and Olean up equipment kept perrrlancntly on•siie is listed in[hd facility's Hazardous Materials Business Plan. This <br /> cgmpntent u inspected at least monthly,and after each use,supplies arc replenished as needed, Defective equipment i,:n pAl ell nr replaced as nececcan,_ <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED; (Com lets onl if a licable) <br /> LOCATION AVAMABILTI'Y <br /> tela. R:ll• a30• <br /> R1L' E`I. R31. <br /> xtz. R:2. <br /> R32. <br /> �.•ns hi3. R23. R33. <br /> RI4. <br /> 6L h, RX <br /> RLS. <br /> S' R35, <br /> } .;,,� ARE RES <br /> 'IV- t�►E.SF(3!NBLE1'E+ i <br /> ,., RESPONSIBLE FOR,AUTHORIZING ANY WORK NECESSARY UNDER TMS RESPONSE PLAN. <br /> neo. I'17ZE RSO. <br /> NAME '!t1 <br /> R417 TITLE <br /> R51. <br /> N'NE R42 TITLE <br /> NAME <br /> R43. TITLE <br /> MOINITORIN <br /> G INDICATORS. <br /> IF MONITORING INDICATES A POSSIBLE UN l HORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADF AS FOLLOWS; <br /> ❑Additional sYslem testing Or data collection Itrspection by qualified persons ©Recalibratiotl of r,3uipntent <br /> Otha: <br /> R60. <br /> UST Responst Play(I2/2010)-113 <br /> bO/Z0i 3r)~d GOOd SV9 11HO tit 9L9L6C:3G0Z CP_ :LT CT0Z/T9/ZT <br />