Laserfiche WebLink
a. Describe thee method thatwillbe utilized to purge and/or inert the tank(s): <br />L 0 <br />Tank/Piping Hauler. <br />Name (mac -S i Co AS i <br />Address l ��Z�Cw C sc��l� �y (U c( -L p -- <br />Phone NOJOp L D— 9:37 X <br />Hauler Registration # (if hauled as hazardous) <br />Tankl9ping Disposal Site: <br />Namer—�� C oJ� j i F c L` <br />Address (�f © LL t JL'- c oj) Cltfl-u 2 i, Q C -(C Zip `Y3 6 -?1' <br />Phone No.(c-I 0 <br />EPA D]# (if transported to a permitted TSD facility) <br />Is the sampling firm an independent third party from the contractor? YES W'N0 [ ) <br />9a. Describe, in detail, how the soil and/or water sample(s) beneath the tank and piping will be obtained: <br />10. Describe how the excavation will be backfilled with suitable material upon removal: <br />11. Handling of excavated soil: <br />a) What material will be used to line the tank pit and cover the stockpile? <br />b) What will be the final destination of the excavated stockpile? <br />10i 11 Qf=- &- t �nM �,Ai, r< •^ i i� J� SO. t S�✓�.t�l�` iSE=tna.--► <br />c) Contaminated Soil Hazardous Waste Hauler. <br />Name 14 Q 0? 6 Hauler Registration # a % G -7 <br />Address S l N o P i tt 12j-) city L c ap C7 f a' 7 O <br />Phone No. <br />EH 23 046 (Revised 10/19198) Page 5 <br />