Laserfiche WebLink
WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONI'T'ORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit. The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(d) and 2641(h) CCR- <br /> Facility <br /> CRFacility Name �� — A) -(�70 art <br /> Facility Address <br /> A. Describe the frequency of performing the monitoring: _ <br /> TankQCA',\�4 ceczmc% �14\okoi TL!�,3soi <br /> `e e- <br /> -Piping Zee c�, Led(- d2�mLcs� ,-)Vne 1n\e�rTc <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Tank See Abse <br /> Piping i0ZYam <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> i_eak ck>r �* ace \occ=Af- car �cr��s t Ls3S0 �5 ';, <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> E. Reporting format for monitoring: <br /> Tank m„ Lbw i Seo arm___ ,1� T1s �M4dc��l�ccr��ls aye onSr�e Fo.ms <br /> Piping �S � <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than every 12 months: A e4 <br /> G. Describe the training necessary for the operation of UST system, including piping, <br /> and the monito ' g equipment: u '�oc 60 kfos cr,3 LS Q— <br /> Cc�lcu 4� � <br />