Laserfiche WebLink
DRAWING INFORMATION <br /> Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br /> Plans drawn to scale in non-erasable print. <br /> Plot plan to show location of tanks and all associated piping. <br /> -+ Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> Tank cross-sectional diagram. <br /> Detail of tank, associated piping, excavation and cover. <br /> Tank(s) and piping approved by a nationally recognized independent testing organization. (Title 23, Chapter 16, <br /> Article 3, Section 2631 (b) & 26351 <br /> ! Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> At the installation site, prior to installation, a tightness test shall be performed on both primary (10) and <br /> secondary (20) containment systems before covering. (Section 2635 (a) (3) & (»)] <br /> Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (h)] <br /> ANK COMPOSITION <br /> T 4 <br /> 101 Ivo <br /> URER �v -� i�vMN�u +\ L l <br /> 5—c.ol LI <br /> ION � \ t 1 <br /> t.;,tN f",Z <br /> 97at, a 0C <br /> N PROTECT ION Z L r- <br /> ED¢ <br /> ILITY WITH 100% <br /> S yFS <br /> K(s) TO BE INSTALLED <br /> A. Steel-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> (2) Vacuum applied to interstitial space. <br /> S. Fiberglass <br /> /Z(1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular (primary tank pressure test). <br /> C. Non-clad steel tank ESection 2635 (a) (2) (A)] <br /> _ (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc.). <br /> _ (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3) Impressed current systems to be inspected no less than every 60 days. <br />