Laserfiche WebLink
piping (cross-sectional diagram, including connections to tank and dispens.�-s). <br /> Vent and tank riser primary containment system equipped with overfill prevention system that: <br /> _ Restricts delivery of flow to tank [Section 2635 (b) (2) (B) or (C)l, or <br /> Provide positive shut off of flow to the tank at no more than 95 % [Section 2635 (b)(2)(C)], or <br /> Vapor recovery piping designed so it cannot contain liquid phase product, or <br /> Suction piping (below grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)] <br /> sloped so contents of the pipe will drain back into the storage tank if the suction is <br /> released. <br /> No valves or pumps installed below grade. <br /> Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br /> l0 Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> LZ Underground primary piping will meet all of the following requirements <br /> Primary piping in contact with hazardous substance under normalop ation conditions shall be: <br /> installed inside a secondary containment system in the form of: econdary pipe_Vault or <br /> _lined trench to be sloped to a collection sump at the low point of the piping. <br /> _ Primary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> Lined trench used as secondary containment <br /> Material compatible with the substance stored. <br /> Covered and capable of supporting any expected vehicular traffic. <br /> Underground piping with secondary containment will be equipped and monitored as follows: <br /> Secondary containment will be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. <br /> Automatic line l k d tect rs wi be installed on r s ized piping <br /> Manufacturer: Model: <br /> Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring system <br /> fails or is disconnected. <br /> State water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br /> Plan review and operating permit fees paid. <br /> Wst is the approximate depth to ground water: <br /> (include source of information - borehole logs, monitoring well data, water <br /> studies, etc.) <br /> TA^3kL p?;�, ttO6 <br /> Total number of tanks on site after installation: f1i� p[7 <br /> *.County/City Fire District and Building Department notified. <br /> Um"th* event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> =i'rmpa ibility [in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> iequtircomentsl as an owner or operator to submit a workplan to PHS-E,40 Site Mitigation Unit prior to initiating any <br /> assessment a• remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br /> A <br /> The QW*r a' operator must acknowledge this responsibility for workplan submittal by signature and date below. <br /> !tsar <br /> Title / Date <br /> 4. <br />