My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
2300 - Underground Storage Tank Program
>
PR0231405
>
INSTALL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 2:06:00 PM
Creation date
10/26/2018 3:48:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL 1999
FileName_PostFix
1999
RECORD_ID
PR0231405
PE
2361
FACILITY_ID
FA0003164
FACILITY_NAME
A ONE GAS & FOOD
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
411 st <br /> Extracts 90Petroleum Purilp <br /> Dimensions <br /> TABLE OF DIMENSIONS FOR PUMP SELECTION LEAK DETECTOR INSTALLATION AND <br /> D PUR <br /> MPTO MANHOLE d COVER MANIFOLD DIMENSIONS <br /> BY RED JACKET <br /> OPTIONAL LEAK DETECTOR BY RED JACKET <br /> 1-112' Purrp ±6" Red Jacket <br /> •. Leak Detector <br /> 7 PIPING BY 2(r ir <br /> CONTRACTOR '-4;.® <br /> 11" <br /> 4-lrZ' BURY <br /> 1 1 B DEPTH <br /> CONDUIT BY� RISER <br /> CONTRACTOR E LENGTH <br /> 4'RISER BY- Driveway 17 Red Jacket <br /> RED JACKET C Grade Leak Detector <br /> ,i <br /> CPUMP <br /> LENGTH <br /> } <br /> ATANK Red Jacket <br /> DIA. Ekodrical Submersible Pump <br /> \ Condu4 <br /> 5J8"±1/8' <br /> 4'Riser �Flex Connector <br /> Tank <br /> 20'x 20"Manhole Red Jacket <br /> Leak Detector <br /> 10' <br /> 13. v <br /> '3 <br /> BOTTOM APPROX. <br /> CLEARANCE 5' <br /> Red Jacket <br /> Subrnersibte Pump <br /> _ Distance between center line of pump motor and cen- <br /> ter line of bottom fill tube should be 3'minimum. Air <br /> locking of pump after product delivery may occur at Tank To Dispensers <br /> distances less than this. <br /> Z. Use this table for single wall tank applications only that g Fbe a� a s<oeI <br /> do not involve manways or sumps. Tanks Tanks <br /> 'B' <br /> Bury 47 46' 48' 64' 77 751/7 84' 90' 97 95' 96" 99112' 108' 120" 126' <br /> t kD r 77 11 11 1 Q7 lor WIT 813 IZ 97 <br /> 27 'C"Purrp Length 0409 0501 0501 0607 0701 0707 08010809 08(J9 C901 0901 0907 1001 1101 1109 <br /> 24' 'D'Purrp to Cover 4 4 6 4 6 4 6 4 6 5 6 4 6 6 4 <br /> "E'Riser Length 9 9 7 9 7 9 7 9 7 8 7 9 7 7 9 <br /> 76' 'C'Pump Length 0501 0507 0509 0701 0709 0801 0809 0901 U901 0907 0909 1001 1009 1109 12111 <br /> 'D'Purrp to Cover 6 4 4 4 4 4 4 6 8 5 4 4 4 4 6 <br /> 'E'Riser Len h 13 15 15 15 15 15 15 13 11 13 15 15 15 15 13 <br /> 3'0" 'C'Purrp Length 0509 0601 0601 0707 0801 0807 0901 0909 0909 1001 1001 1007 1101 1201 1209 <br /> 36' 'D'Pump to Cover 4 4 6 4 6 4 6 4 6 5 6 4 6 6 4 <br /> 'E'Riser Length 21 21 19 21 19 21 19 1 19 20 19 21 19 19 21 <br /> 3'6' 'C Purrp Length 0601 0607 0609 0801 0809 0901 0909 1001 1001 1007 1009 1101 1109 1209 1301 <br /> 47 'D'Purrp to Cover 6 4 4 4 4 4 4 6 8 5 4 4 4 4 6 <br /> 'E'Riser Length 25 27 27 27 27 27 9027 25 23 26 27 27 27 27 25 <br /> 4'0" 'C'Purrp Length 0609 0701 0701 0807 0901 07 1001 1009 1009 7101 1101 1107 1201 1301 1309 <br /> 48" 'D'Pump to Cover 4 4 6 4 6 4 6 4 6 5 6 4 6 6 4 <br /> 'E'Riser Length 33 33 31 33 31 33 31 33 31 32 31 33 31 31 33 <br /> 4'6" "C'Pump Length 0701 0707 0709 0901 0909 1001 1009 1101 1101 1107 1109 1201 1209 1309 1401 <br /> 54' 'D"Pump to Cover 6 4 4 4 4 4 4 6 8 5 4 4 44 6 <br /> "E'Riser Length 37 39 39 39 39 39 39 37 35 38 39 39 39 39 37 <br /> A variety of tank types with various materials of construction are currently In use.The Inside diameter,(I.D.)which is critical to <br /> r. <br /> determining correct pump length,can differ appreciably though outside diameters may be similar.Red Jacket Pumps are built <br /> to order to accommodate Individual tank and bury depth requirements.Accurate tank and site measurements are critical to <br /> achieve the proper pump length and avoid damage to the pump or tank which can result In environmental damage.Petro Express <br /> Bulletin,RJ 23-25(10/90)explains the Information required for proper pump sizing. <br /> 18 R•) 5190- 3/93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.