My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
2300 - Underground Storage Tank Program
>
PR0231405
>
REMOVAL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 2:30:16 PM
Creation date
10/29/2018 9:31:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL 1999
FileName_PostFix
1999
RECORD_ID
PR0231405
PE
2361
FACILITY_ID
FA0003164
FACILITY_NAME
A ONE GAS & FOOD
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Corrosion protection system <br />Please describe the type of corrosion protection system you propose to install. The cathodic protection <br />system retrofitted on existing UST systems must be designed by a corrosion specialist certified by the <br />National Association of Corrosion Engineers (NACE) or by a qualified professional engineer. Metal <br />components of the UST system (i.e. submersible pumps, piping etc) that routinely contain fuel and are in <br />contact with the ground must also be cathodically protected. <br />Certification: (Application will be disapproved without this information) <br />Attach detailed information as to the methods used to line the tank and a certification from the manufacturer, <br />or his authorized representative, of the tank lining material's capability to store the proposed hazardous <br />substances. <br />Describe the monitoring performance standard you propose to use after the lining/ repair is co <br />a <br />7. a. Describe how the hazardous waste generated from the tank lining/repair will be managed on site. <br />(Note: all hazardous waste stored on site must be managed in accordance with Title 22 California <br />CodJof Regulations (CCR)). <br />b. Identify the contractor performing the UST decontamination: <br />Name <br />S <br />r�c,I rke-S <br />YVic�5Phonq Z9— <br />Address rid <br />�, i6�J'Y <br />Z,15' <br />City�oS /�c,x�S Zip 931o�S� <br />C. Residual Fuel Hauler: <br />Company Name�� <br />Lyc�g %iG': <br />Phon��'7 <br />Addressa3% <br />�, i6�J'Y <br />,, <br />City a/�f�' Zip <br />Transporter's ID# <br />d��5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.