Laserfiche WebLink
j. A statement from the lining applicator confirming that the materials that will be used are the same <br />materials that were evaluated by the testing organization. <br />_k. A statement from the lining applicator confirming that the processes that will be used are the same <br />processes that were evaluated by the testing organization. <br />_I. A description of tank lining processes to be used by the applicator. <br />_m. A statement from the company that received the evaluation describing training provided to the <br />authorized applicator. <br />10. Which of the following unexpired contractors licenses does the lining applicator have: (Please submit a copy <br />of the license to PHS-EHD) <br />General Engineering Contractor (A) <br />Limited Specialty/Service Station Maintenance (C -61/D40) <br />Limited Specialty/Synthetic Products (C -61/D12) <br />Limited Specialty/Protective Coating (C -61/D51) <br />Painting and Decorating (C-33) <br />11. Is the special inspector a registered professional engineer?-yes_no <br />12. Holes and splits in steel tanks, if any, will be plugged with self -tapping bolts, boiler plugs, water- <br />tight, hydraulic cement, or welding. <br />13. Striker plates will be installed beneath all tank openings that could be used for manual dipsticking. <br />14. Lining will be applied within 8 hours of sandblasting. <br />15. Certification by coatings expert or special inspector that the tank was lined properly: <br />a. Steel or clad UST's <br />visual check of lining <br />thickness test of lining <br />hardness test of lining <br />electrical resistance holiday detector test <br />vacuum test <br />b. Fiberglass UST's <br />visual check of lining <br />thickness test of lining <br />hardness test of lining <br />vacuum test (not required if submerged by 50% of depth in ground water) <br />16. If a coatings expert was used, is he financially independent from the tank owner and lining <br />company? _yes no <br />17. Tank integrity test will be conducted. <br />18. A guideline has been submitted by the lining company for local agency inspectors to use when <br />conducting a field inspection of the tank lining. <br />