My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
2300 - Underground Storage Tank Program
>
PR0231405
>
REMOVAL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 2:30:16 PM
Creation date
10/29/2018 9:31:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL 1999
FileName_PostFix
1999
RECORD_ID
PR0231405
PE
2361
FACILITY_ID
FA0003164
FACILITY_NAME
A ONE GAS & FOOD
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUN -30-1999 WED 12:01 Ph CONTAIKMEN7 SOLATIONS FAX N0, 800$3947'27 P. Ob <br />kNL- <br />°. TANK INSPECTION PROCEDURES � 1 2 3 4 5 <br />Underwriter Laboratories Taber number (to correspond with invruorA Rnd <br />UL label an tank.) <br />Tank nominal capacity (galions). -- - <br />I. Tank N4easuremenls (use fill location), r� <br />a. Intermediate tank measurements in inches (to help confirm proper <br />ball and ballast procedures). <br />(1) After pressure test, measure tank internal diameter prior to <br />backtllling (s" I below), - — -- ---- <br />(2) After baacklill Is to top of larik, meaasure from tank bottom to <br />bottom of fitting (see I belowl. - — <br />(3) Calculated tank deflection with backfill at tank top (subtract <br />measurement s2 from measurement at). <br />b. Final Tank Measurements In Inches p help confirm tank has proper <br />support). -- — <br />(1) Initial lank measurement (from at). <br />(2) After bacMiil is at subgrade (prior to surface pad), measure from <br />tank bottom to top of fill tuber {prior to Installation of drop tube) <br />(see 11 below). -- - ---- <br />(3) Measure from bottom of fining to top of fill tube (see III below). - - ---- - <br />(4) Calculate talk internal dlarrWer (subUact measurement b3 from b2). -- <br />(3) Tank deflection (subtract measurement b4 from 151). - - <br />Measurement Instructions <br />sail measurements for vertical deflection are mads from the bottom of the tank to the bottom of the fitting, <br />kill measurements shlouW be made in inches using a standard nonmetallic gauge stick. <br />XII measurements should be made through the till fitting (use the same fitting for all measurements). <br />I <br />FAD 71(.7IE6 <br />lllEltriJPEAi7'rf 1 <br />Measurement 1 Is the inside diameter <br />of the tank at the gauge opening. <br />Measure from the. bottom of tha tank <br />to the bottom of the fitting. This mea- <br />surement shouid be taken prior to <br />placing any backfill. <br />Measurement 111 is the distance from <br />the bottom of the tank to the top of <br />the 1111 tuba. This measurement should <br />be taken prior to insertion of the d rop <br />tube. Backfill should be to subgrade3 <br />at this time. <br />Measurement III is the distance from <br />the bottom of tho fitting to the top of <br />the fill tube This measurement Is <br />taken by drMng a nail into the t" point <br />at a right anglo to the gauge stck. <br />Lower the gauge stick down the fill <br />tube fur enough to exterA bclow the <br />bottom of the fitting. Litt the gauge <br />stick unti the nail catches on the <br />lip of the fitting_ Read measurement <br />at the top of tho fill pipe. Subtract V <br />to allow for the point where the nail is <br />in the gauge stick. <br />WARNING: If the answer In either measurernent 83 or <br />b5 is in excess o1 the appropriate value shown In Table <br />A, Iimn disaely contact Tank Technical Support (409- <br />756-7731) prior to proceeding with the Installation. <br />Table 1s< _ 'For warranty details, see Micatlom on <br />Tank EAaximum Skrgle•Wall Fberglass Tanks for Undergruutd <br />Diornet Deflection Pelroleurn Storage, Pub No. TNTC 1024 and <br />4' !PP Double -Wall Frberglass Tanks for Undergrourr <br />6' 314' petroleum Slarage, Pub. No, TNK 1023. <br />$' 1-114"- - ---- <br />1D' 1-112" <br />Irestatiai on was In accordance with f=luid Products Installa- <br />Don Inslructflons Rub. No. INST 61301. <br />owner's Representative <br />C�ontractor-s Representative <br />Notary Pubk (Op60-1) Oat© <br />NOTE; Owner must retain this document to substantiate any <br />luture stlu(.ttrral warranty claim. <br />Tank Technlcai Support 14[18) 756-7731 <br />Pub_ No. MST 60150 • LJtrro J.SA Oct 1948 • CortV,n*rtSojuliuns. Inc * Al Pights Rsswv®d <br />L W L abed INV 9£ 1 L o L awl 6610£19 :@W1 NOSSVS 311315 el 083Hd3HS MJ HV -1 :woJ-� <br />
The URL can be used to link to this page
Your browser does not support the video tag.