My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
2300 - Underground Storage Tank Program
>
PR0231405
>
REMOVAL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 2:30:16 PM
Creation date
10/29/2018 9:31:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL 1999
FileName_PostFix
1999
RECORD_ID
PR0231405
PE
2361
FACILITY_ID
FA0003164
FACILITY_NAME
A ONE GAS & FOOD
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From: LARRY SHEPHERD To: Steve sasson Date 630199 Time: a:17:04 AM Page 3 of 25 <br />2.4 site background <br />thharry Shepherd Safety director 01T.1- BRYANT INC- has developed <br />is SITE SAFETY AND WORK PLAN in response to remove and replace <br />the UST at 574 West Grantime Road Tracy, CA. 7lte county of San Joaquin <br />I)cpartment of Inviroomental Health says that the tanks are unsuitable to be <br />in the ground. This tank needs extracted and replaced, as necessary, to bring <br />up to standards. <br />3.0 scope of operations <br />The work that is to be performed at 574 West Grantline road, Tracy, ca, is <br />to remove the '15k -gallon tank and replace it with anew tank that meets the <br />same requirements as the initial site plants. The second part to the project is <br />to remove the pea gravel from around the IOk-gallon tank.Then un -strap the <br />tank from the deadmen and recheck the tank for round. If this is <br />unsuccessful the next step is to lilt the tank up out of the hole. At this point <br />the factexy technician will remeasure the tang for round. If the tank goes <br />back to round then the factory rep will submit a report to pHS/F�tID that will <br />recertitY the tank to be reinstalled. If the tank is still unable to allow it self <br />to go back to rowed the warranty is void on the tank. The tank will need to <br />be replaced with a tank that meets all the requirements of the original site <br />work plan. 'llie plumbing will he replaced by certified tech. (certificates <br />included in this packet) upon a Plumb mg inspection by the county the <br />installation is complete. The next step will be to back till the pea gravel and <br />Pour concrete to top the tanks. Meeting the requirements of the original site <br />work plans. <br />
The URL can be used to link to this page
Your browser does not support the video tag.