Laserfiche WebLink
05/28/1999 10:22 209-835-4757 PQSTNET PAGE 10/19 <br />.13..1 Gas Station Operations <br />All gas sells will halt during the removal and replacment process. <br />Once the tanks have been installed and meet all local and federal codes the <br />station may proceed with normal sells. <br />14.0 Professional Engineer <br />Joe Plecnik has been the consultant and lel: for this project. Toe gives <br />advise where is needed and will be available for comment on this and other <br />sections of this project. <br />15.0 Tank Warranty <br />Containment Solutions will be on site during this project. To assure <br />that the install of the tanks meet all requirements to uphold the integrity for <br />the warranty of the tanks. <br />16.0 Tank Venting <br />The vapor lines to the tanks will be disconnected and venting <br />during the removal and replacement of the tanks. To assure that the work <br />area is free of volatile vapors during the process of RIR of the tanks. <br />