Laserfiche WebLink
ACDEH,August 2003 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: n Piping Manufacturer xIndustry Standard - Professional Engineer <br /> Other(Specify) <br /> Test Method Used: x Pressure 0 Vacuum 1 Hydrostatic <br /> 0 Other(Specify) <br /> �d <br /> Test Equipment Used:O-15 PSI Gauge Equipment Resolution:1/2psi <br /> Piping Run# '� Piping Run# '0'�- Piping Run# Piping Run#9y"'z <br /> rPipingMaternial: <br /> Piping Manufacturer: <br /> Piping Diameter: /�- <br /> Length of Piping Run: <br /> Product Stored: 8 2 62 <br /> Method and location of P <br /> piping-run isolation: /-G % G s "'-7> <br /> Wait time between applying <br /> pressure/vacuum/water and 25 _ <br /> starting test: <br /> Test Start Time: / 'L'� <br /> Initial Reading(RI): Jr-� f . oc�L <br /> Test End Time: /.'yf ¢" '�l 9" ��',l '�"' �.Z '/le'o,. <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Ri): �-- <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ass 0 Fail ass ❑Failass 0 Fail ass ❑ Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> y� <br /> s' Y <br /> U= 2016 <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br />