Laserfiche WebLink
PART B: SPILL PREVENTION, CONTROL,&COUNTERMEASURES <br /> 1. Rbsponsible Person <br /> The dealership's Service Manager is the Responsible Person for this plan. The designated Responsible Person is <br /> responsible for oil spill prevention,control,and countermeasure activities. <br /> 2. Potential Spills of Oil—Prediction and Control <br /> Note: A facility map illustrating the location of each listed tank/container is included as Attachment(A). <br /> Source Probable Type Maximum <br /> No. Description of Failure Quantity(gallons) Flow Rate Probable Direction of Flow Secondary Containment <br /> (Gals/hour) <br /> Above ground gasoline Small leak or Horizontal square <br /> steel tank located Immediate a s k <br /> I outside north of the complete 1,000 gallons total release North into the storm drain out of service}, <br /> service department. rupture <br /> Above ground waste oil Small leak or Horizontal rectangle Immediate <br /> 2 steel tank located in the complete North onto oil room floor Double wall steel tank <br /> oil room. rupture 480 gallons total release <br /> Above ground new oil Small leak or Horizontal rectangle Immediate <br /> 3 steel tank located in the complete North onto oil room floor Double wall steel tank <br /> oil room. rupture 500 gallons total release <br /> Above ground ATF Small leak or Horizontal rectangle Immediate <br /> 4 steel tank located in the complete 240 gallons total release North onto oil room floor Double wall steel tank <br /> oil room. rupture <br /> Above ground new oil Small leak or Horizontal rectangle Immediate <br /> 5 steel tank located in complete 185 gallons total release West onto quick lube floor Double wall steel tank <br /> quick lube. rupture <br /> Maximum of two waste <br /> fuel steel drums Small leak or Immediate Steel Drum set within a <br /> 6 located in the complete 55 gallons each total release Southwest onto shop floor containment pallet <br /> Nouthwest area of rupture. <br /> service shop. <br /> Maximum of two new Small leak or <br /> oil steel drums Immediate Steel drum set within a <br /> 2 located in the quick complete 55 gallons each total release Northeast onto quicklube Floor containment pallet <br /> lube rupture. <br /> Maximum of two new Small leak or ImmediateSteel drum set within a <br /> 8 oil steel,drums located complete 55 gallons each total release Norteast onto quick lube floor containment pallet <br /> in quick lube rupture. <br /> Primary responsible Emergency Coordinator: Ryan Ford, Service Manager,925-354-3794 <br /> Secondary responsible Emergency Coordinator: Todd Tannahill,Assistant Service Manager, <br /> 209-627-8873 RECEIVED <br /> MAY 3 0 2018 <br /> ENVIRONMENTAL <br /> HEALTH DEPARTMENT Tracy Chevrolet SPCC Plan <br /> 08-14 <br />