Laserfiche WebLink
Environmental Protection Agency Pt. 112 <br /> engine on a public vessel) and any dis- PART 112—OIL POLLUTION <br /> charges of such oil accumulated in the PREVENTION <br /> bilges of a vessel discharged in compli- <br /> ance with MARPOL 73/78, Annex I, as Sec. <br /> provided in 33 CFR part 151, subpart A; <br /> (b) Other discharges of oil permitted Subpart A—Applicability, Definitions, and <br /> under MARPOL 73/78, Annex I, as pro- General Requirements For All Facilities <br /> vided in 33 CFR part 151, subpart A; and and All Types of Oils <br /> (c) Any discharge of oil explicitly 112.1 General applicability. <br /> permitted by the Administrator in con- 112.2 Definitions. <br /> nection with research, demonstration 112.3 Requirement to prepare and imple- <br /> projects, or studies relating to the pre- ment a Spill Prevention, Control, and <br /> vention, control, or abatement of oil Countermeasure Plan. <br /> pollution. 112.4 Amendment of Spill Prevention, Con- <br /> trol, and Countermeasure Plan by Re- <br /> gional Administrator. <br /> §110.6 Notice. 112.5 Amendment of Spill Prevention, Con- <br /> trol,and Countermeasure Plan by owners <br /> Any person in charge of a vessel or of or operators. <br /> an onshore or offshore facility shall, as 112.6 [Reserved] <br /> soon as he or she has knowledge of any 112.7 General requirements for Spill Preven- <br /> discharge of oil from such vessel or fa- tion, Control, and Countermeasure <br /> Plans. <br /> cility in violation of section 311(b)(3) of <br /> the Act, immediately notify the Na- Subpart S—Requirements for Petroleum <br /> tional Response Center (NRC) (800-424- Oils and Non-Petroleum Oils, Except <br /> 8802; in the Washington, DC metropoli- Animal Fats and Oils and Greases, <br /> tan area, 202-426-2675). If direct report- and Fish and Marine Mammal Oils; <br /> ing to the NRC is not practicable, re- and Vegetable Oils (Including Oils <br /> ports may be made to the Coast Guard from Seeds, Nuts, Fruits,and Kernels) <br /> or EPA predesignated On-Scene Coordi- 112.8 Spill Prevention, Control, and Coun- <br /> nator (OSC) for the geographic area termeasure Plan requirements for on- <br /> where the discharge occurs. All such shore facilities (excluding production fa- <br /> reports shall be promptly relayed to cilities). <br /> the NRC. If it is not possible to notify 112.9 Spill Prevention, Control, and Coun- <br /> the NRC or the predesignated OCS im- termeasure Plan requirements for on- <br /> mediately, reports may be made imme- shore oil production facilities. <br /> diately to the nearest Coast Guard 112.10 Spill Prevention, Control, and Coun- <br /> termeasure Plan requirements for on- <br /> shore oil drilling and workover facilities. <br /> charge of the vessel or onshore or off- 112.11 Spill Prevention, Control, and Coun- <br /> shore facility notifies the NRC as soon termeasure Plan requirements for off- <br /> as possible. The reports shall be made shore oil drilling, production, or <br /> in accordance with such procedures as workover facilities. <br /> the Secretary of Transportation may <br /> prescribe. The procedures for such no- Subpart C—Requirements for Animal Fats <br /> tice are set forth in U.S. Coast Guard and Oils and Greases, and Fish and <br /> regulations, 33 CFR part 153, subpart B Marine Mammal Oils; and for Vege- <br /> and in the National Oil and Hazardous table Oils, Including Oils from Seeds, <br /> Substances Pollution Contingency Nuts, Fruits and Kernels <br /> Plan, 40 CFR part 300, subpart E. 112.12 Spill Prevention, Control, and Coun- <br /> (Approved by the Office of Management and termeasure Plan requirements for on- <br /> shore facilities (excluding production fa- <br /> Budget under control number 2050-0046) cilities). <br /> [52 FR 10719, Apr. 2, 1987. Redesignated and 112.13 Spill Prevention, Control, and Coun- <br /> amended at 61 FR 7421, Feb. 28, 1996; 61 FR termeasure Plan requirements for on- <br /> 14032,Mar.29, 19961 shore oil production facilities. <br /> 112.14 Spill Prevention, Control, and Coun- <br /> termeasure Plan requirements for on- <br /> shore oil drilling and workover facilities. <br /> 19 <br />