Laserfiche WebLink
§112.2 40 CFR Ch. 1 (7-1-05 Edition) <br /> that minimizes the potential for dis- (4) If the Regional Administrator <br /> charges. The SPCC Plan must address makes a final determination that an <br /> all relevant spill prevention, control, SPCC Plan, or applicable part, is nec- <br /> and countermeasures necessary at the essary, the owner or operator must pre- <br /> specific facility. Compliance with this pare the Plan, or applicable part, with- <br /> part does not in any way relieve the in six months of that final determina- <br /> owner or operator of an onshore or an tion and implement the Plan, or appli- <br /> offshore facility from compliance with cable part, as soon as possible, but not <br /> other Federal, State, or local laws. later than one year after the Regional <br /> (f) Notwithstanding paragraph (d) of Administrator has made a final deter- <br /> this section, the Regional Adminis- mination. <br /> trator may require that the owner or (5) The owner or operator may appeal <br /> operator of any facility subject to the a final determination made by the Re- <br /> jurisdiction of EPA under section 3110) gional Administrator requiring prepa- <br /> of the CWA prepare and implement an ration and implementation of an SPCC <br /> SPCC Plan, or any applicable part, to Plan, or applicable part, under this <br /> carry out the purposes of the CWA. paragraph. The owner or operator must <br /> (1) Following a preliminary deter- make the appeal to the Administrator <br /> mination, the Regional Administrator of EPA within 30 days of receipt of the <br /> must provide a written notice to the final determination under paragraph <br /> owner or operator stating the reasons (b)(3) of this section from the Regional <br /> why he must prepare an SPCC Plan, or Administrator requiring preparation <br /> applicable part. The Regional Adminis- and/or implementation of an SPCC <br /> trator must send such notice to the Plan, or applicable part. The owner or <br /> owner or operator by certified mail or operator must send a complete copy of <br /> by personal delivery. If the owner or the appeal to the Regional Adminis- <br /> operator is a corporation, the Regional trator at the time he makes the appeal <br /> Administrator must also mail a copy of to the Administrator. The appeal must <br /> contain a clear and concise statement <br /> such notice to the registered agent, if <br /> any and if known, of the corporation in of the issues and points fact in the <br /> the State where the facility is located. case. In the appeal, the owner or oper- <br /> ator may also provide additional infor- <br /> (2) Within 30 days of receipt of such mation. The additional information <br /> written notice, the owner or operator may be from any person. The Adminis- <br /> may provide information and data and trator may request additional informa- <br /> may consult with the Agency about the tion from the owner or operator. The <br /> need to prepare an SPCC Plan, or appli- Administrator must render a decision <br /> cable part. within 60 days of receiving the appeal <br /> (3) Within 30 days following the time or additional information submitted by <br /> under paragraph (b)(2) of this section the owner or operator and must serve <br /> within which the owner or operator the owner or operator with the decision <br /> may provide information and data and made in the appeal in the manner de- <br /> consult with the Agency about the scribed in paragraph (f)(1) of this sec- <br /> need to prepare an SPCC Plan, or appli- tion. <br /> cable part, the Regional Administrator <br /> must make a final determination re- §112.2 Definitions. <br /> garding whether the owner or operator For the purposes of this part: <br /> is required to prepare and implement Adverse weather means weather condi- <br /> an SPCC Plan, or applicable part. The tions that make it difficult for re- <br /> Regional Administrator must send the sponse equipment and personnel to <br /> final determination to the owner or op- clean up or remove spilled oil, and that <br /> erator by certified mail or by personal must be considered when identifying <br /> delivery. If the owner or operator is a response systems and equipment in a <br /> corporation, the Regional Adminis- response plan for the applicable oper- <br /> trator must also mail a copy of the ating environment. Factors to consider <br /> final determination to the registered include significant wave height as <br /> agent, if any and if known, of the cor- specified in Appendix E to this part (as <br /> poration in the State where the facility appropriate), ice conditions, tempera- <br /> is located. tures, weather-related visibility, and <br /> 22 <br />