Laserfiche WebLink
SERVICE CENTER <br />(Inspection required as dictated by Part ll, Section 3, SPCC Plan) <br />Hazardous Materials Storage Area: <br />• Stored Securely <br />♦ Proper Labels <br />• Incompatibles Separate <br />• No Spills/Leaks <br />Compressed Gas/Secured/Capped/Labeled <br />Storage Tanks/Tanker Trucks: <br />• No spills/Leaks <br />• No Evidence of Corrosion/Cracking <br />• Overfill Precautions in Place <br />• Leak Detect System Operational <br />Oil Filled Electrical Equipment Storage Area: <br />• Equipment Upright <br />• Drums Labeled <br />• No Spills/Leaks <br />• Stored in Proper Location <br />Emergency Equipment: <br />• Good condition - Protective Clothing <br />• Fire Extinguishers <br />• Cleanup Supplies <br />• Adequate Supplies Available <br />FUEL ISLAND <br />(Suggested weekly inspection) <br />Hoses: <br />• No kinks, flat -spots, tears, or blockages which substantially <br />impact flow. <br />Boots: <br />♦ No triangular tears greater than 1/2" on side <br />• No holes greater than 1/2" in diameter <br />• No slits greater than 1" in length <br />Face Plate: <br />• Good face seal over 3/4 of the face plate <br />Nozzle: <br />• No shut off malfunctions <br />• Operating hold -open latches <br />Valves: <br />• Pressure/vacuum relief valves, vapor check valves, dry <br />break valves are operable and in good shape <br />Fuel Island/Tanks: <br />• No leaks inside dispensers <br />• Sumps beneath dispensers clean <br />• General housekeeping on island <br />• Fill caps in place w/gaskets <br />• No absence or disconnection of required equipment <br />Hose Retractor: <br />• Taut, retracts properly <br />• 10" Maximum from nozzle to hose bend <br />• 10" Minimum from hose bend to ground <br />Other Items: <br />• Monthly - Record throughput if required <br />• Annually or after worked on - Check drop tube within 6" <br />of bottom tank <br />• Annually - Perform leak detection system calibration <br />and maintenance <br />• Other requirements as stated on permit <br />