Laserfiche WebLink
ATTACHMENT 8 <br />Procedure for Environmental Plans at Gas <br />Transmission Facilities <br />Utility Procedure: TD-455OP-05 <br />Effective 1/1 /2010 <br />© 2010 Pacific Gas and Electric Company. All rights reserved. Page 2 of 3 <br />Clearly mark up a copy of the map to note changes and <br />❑ No changes <br />Q <br />differences between actual site conditions and what is <br />shown on the HMBP map. <br />Changes to: <br />o <br />❑ fences, gates, locks, card readers, keys, guards, access <br />Jpoints <br />❑ structures <br />❑ tanks or drums (list contents) <br />❑ oil -filled equipment <br />LL <br />❑ emergency procedures or assembly area <br />cWhat <br />is the emergency evacuation signal (bell, alarm)? <br />❑Yes. <br />a� <br />Are communication and/or alarm systems in place and <br />C: <br />operational? <br />❑ No (explain): <br />U 0) <br />C C <br />Q) Z_ <br />0) <br />O <br />N V <br />E <br />What is the "all clear" signal? <br />C:Update <br />tables with current facility conditions, including <br />❑ No changes <br />E <br />the locations of the following : <br />❑ Changes noted on facility layout map and tables. <br />� m <br />w F- <br />. First aid kits. <br />u o <br />• Spill response kits. <br />Fire extinguishers. <br />6) 'c <br />. Hazardous waste storage (HWS) areas. <br />— <br />. Hazardous waste accumulation (HWAA) areas. <br />Lu <br />© 2010 Pacific Gas and Electric Company. All rights reserved. Page 2 of 3 <br />