My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
1401
>
2200 - Hazardous Waste Program
>
PR0514495
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2021 2:20:15 PM
Creation date
10/31/2018 12:12:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514495
PE
2227
FACILITY_ID
FA0011020
FACILITY_NAME
PEP BOYS #562
STREET_NUMBER
1401
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06208029
CURRENT_STATUS
01
SITE_LOCATION
1401 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\C\CHEROKEE\1401\COMPLIANCE INFO\RTC 02-14-12.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit D <br /> A <br /> FA .. <br /> EMERGENCY PROCEDURES <br /> Evacuation Plan <br /> Should there be a threatened release;the emergency coordinator(Manager on Duty(MOD))would notify all <br /> persons on site to evacuate via verbal communication,intercom and/or taming on the fire alarm.Everyone on <br /> site shall exit the building using the nearest exterior door and meet at a staging area(front of store).The <br /> emergency coordinator will be available at the staging area to assist emergency responders and/or emergency <br /> contractors.The emergency coordinator shall immediately contact the Property Management Help Desk, 1- <br /> 888-545-8532 and other essential personnel to report the incident. <br /> Small Spills(typically under 5 gallons),which have not entered any type of drain: <br /> 1. Determine the source of the release and attempt to prevent any additional materials from <br /> escaping. <br /> 2. Utilize the contents of the spill kit(See Figure I for photo and contents). Place the socks <br /> around the perimeter of the spill to prevent it from spreading. Spread corncob absorbent on <br /> the spilled material. If additional absorbent is required,shop-use extra absorbent from the <br /> retain section. <br /> 3. Collect the saturated absorbent and place it inside the spill kit. <br /> 4. Contact Pep Boys'Environmental Department to discuss spill and arrange for disposal of the <br /> kit,and also arrange to have a replacement kit sent out. <br /> 5. Complete the Spill Report Form and place with this plan. <br /> Figure i —Spill Kit <br /> Contents include: <br /> Chemical Resistant Gloves <br /> 3"X 4" Sock Booms <br /> => Corncob Absorbent <br /> => Acid Neutralizer <br /> => Trash Bags <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.