Laserfiche WebLink
INSTRUCTIONS: <br /> Superscripts: <br /> I - Please contact your local Administering Agency if you handle quantities of Acutely Hazardous Materials above state <br /> thresholds and have not submitted a business plan. (Remember that California Acutely Hazardous Materials are identical to <br /> EPA Extremely Hazardous Substances). <br /> 3 - 'Process Designation" is provided for facilities that, with the Administering Agency approval, would most easily be <br /> reported by process. For a business that reports the business plan data by process,this will allow subdivision of facility RMPP <br /> registration data in similar format to the business plans. This format could simplify facility inspections and future emergency <br /> response. <br /> 3 - Use the EPA list Extremely Hazardous Substances from the Federal Register, 40CFR 355 (Sections 302 and 304). <br /> (Note: This list may be changed on a yearly basis. Be sure the list used for compliance is the updated list. An updated list can <br /> be obtained from EPA or the State of California Environmental Affairs Agency.) If appropriate, attach a copy of the inventory <br /> (submitted to your Administering Agency in your business plan)with all Acutely Hazardous Materials highlighted. <br /> -Do not include Trade Secret information in these-descriptions. <br /> General: <br /> For emergency response purposes, 9 these elements are appropriate,it would be desirable to describe the following to the <br /> Administering Agency: <br /> 1. Batch Process: <br /> a. What raw materials? <br /> b. What operating pressure range? <br /> c. What operating temperature range? <br /> d. Batch capacity rating? <br /> e. Product characteristics? (e.g., chemical state,flammability,toxicity, etc.) <br /> I. Critical process points and characteristics? <br /> 2. Continuous Process: (Similar information as above.) <br /> Nate: <br /> 'Pursuant to §25534, the Administering Agency may require the submission of a Risk Management Prevention Program <br /> (RMPP), if the Administering Agency determines that the handler's operation may present an acutely hazardous materials <br /> accident risk. The handler shall prepare the RMPP in accordance with subdivision (c) (of §25534). The RMPP shall be <br /> prepared within 12 months following the request made by the Administering Agency pursuant to this section.' (§25534 (c) <br /> Health 8 Safety Code). <br /> An amendment to the RMPP must be submitted to the Administering Agency within 30 days of <br /> 1. Any additional handling of acutely hazardous materials. <br /> 2. Any material or substantial alternations to business activities. <br /> 3. Change of address,business ownership,or business name. (§25533(c)Health&Safety Code). <br /> EVERY BUSINESS REQUIRED TO SUBMIT AN RMPP SHALL IMPLEMENT THE APPROVED RMPP <br /> V (b) <br />