Laserfiche WebLink
Table 3: USED COOLANT Inventory Control & Inspection Log w <br /> Year -aTask Loch <br /> This log is to be completed daily (production workdays) for each tank system and original <br /> inspection. condition of each tank system (look for leaks, corrosion, condition of con <br /> condition in comments. Include signature of person doing inspection. <br /> When product is removed from tank, fill out date, type of product removed, gall <br /> receipt for product must also be kept on file. <br /> Date Tank Level Level Level <br /> Condition Tank I Tank 2 Tank 3 <br /> -! -/ n <br /> 19-2 3-( rt <br /> / C <br /> r 7 ~ <br /> AY. <br /> Figure 13:Use Antifreeze tank inspection log. <br />