Laserfiche WebLink
nEAkTHCON' <br /> 1) Conducting daily inspections and necessary repairs/replacement of the current <br /> stormwater BMPs <br /> 2) Capping drain inlets permanently or maintaining emergency covers onsite in the event <br /> of a release from piping or ancillary equipment outside the secondary containment <br /> tanks. <br /> 3) Installing a trench or berm between the drain racks and the drainage swales to preclude <br /> spilled materials flowing into the swales. <br /> 4) Installing a sump that collects materials that flow into the drains and re-routing surface <br /> runoff away from the drains. <br /> 5) Installing an in-line separator that can remove oil and antifreeze from the fluids in the <br /> drain. <br /> Findings from the Hazardous Waste Tank System Assessment, evaluated against the requirements <br /> identified in 22 CCR Section 66265, are summarized in Table 4. <br /> Hazardous Waste Tank Assessment Stockton,CA <br /> Auto Parts Group—Pick-N-Pull 11 Project No.04.20160002 <br />