My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1988 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRANK WEST
>
152
>
2200 - Hazardous Waste Program
>
PR0539866
>
COMPLIANCE INFO 1988 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2018 10:46:00 AM
Creation date
10/31/2018 4:06:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1988 - 2015
RECORD_ID
PR0539866
PE
2230
FACILITY_ID
FA0022802
FACILITY_NAME
CIRCUIT WORKS INC
STREET_NUMBER
152
STREET_NAME
FRANK WEST
STREET_TYPE
CIR
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
152 FRANK WEST CIR
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FRANK WEST\152\PR0539866\COMPLIANCE INFO 1988 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 1988 - 2015
QuestysRecordDate
3/1/2018 11:18:34 PM
QuestysRecordID
3813371
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
209-477-2440 W. T. HULL & CO_ / PI`1E 790 POS J RN 28194 10: S1 <br />bt `1111 <br />• • /�wixosamicEuate+ctaewxcwc. <br />Site Remediation Proposal Page 4 <br />152 Frank West Circle - Stockton, CA <br />December 17,1993 <br />Project Schedule <br />ASE and C.K.C., Inc. are available to begin services after January 3, 1994 and <br />propose a project completion schedule of 9 weeks. <br />Cost Estimate <br />ASE estimates that the tasks outlined in this proposal can be completed for a <br />fee of $339,371.00 as summarized at Appendix A. ASE wishes to emphasize that this <br />is a cost estimate and is not a firm offer to complete the Site Remediation Project for <br />a fixed price. It is offered as a best estimate of what the project should cost, but all <br />billings will be on a time and materials basis in accordance with current ASE and <br />C.KC, Inc. rate schedules. <br />The cost estimate is based on the assumption that ASE will receive direct <br />reimbursement from the Client for services provided by ASE and the designated <br />laboratory, and that the Client will directly contract with C.K.C., Inc. for the <br />accomplishment of Tasks 1 - 13 of the project. If this is not satisfactory, ASE is <br />willing to subcontract Czc.C., Inc for an increased fee equal to 15% of C.KC.'s <br />billings. <br />Sincerely, <br />Kyle C. West, MS, REA <br />Senior Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.