Laserfiche WebLink
209-477-2440 W. T. HULL & CO_ / PI`1E 790 POS J RN 28194 10: S1 <br />bt `1111 <br />• • /�wixosamicEuate+ctaewxcwc. <br />Site Remediation Proposal Page 4 <br />152 Frank West Circle - Stockton, CA <br />December 17,1993 <br />Project Schedule <br />ASE and C.K.C., Inc. are available to begin services after January 3, 1994 and <br />propose a project completion schedule of 9 weeks. <br />Cost Estimate <br />ASE estimates that the tasks outlined in this proposal can be completed for a <br />fee of $339,371.00 as summarized at Appendix A. ASE wishes to emphasize that this <br />is a cost estimate and is not a firm offer to complete the Site Remediation Project for <br />a fixed price. It is offered as a best estimate of what the project should cost, but all <br />billings will be on a time and materials basis in accordance with current ASE and <br />C.KC, Inc. rate schedules. <br />The cost estimate is based on the assumption that ASE will receive direct <br />reimbursement from the Client for services provided by ASE and the designated <br />laboratory, and that the Client will directly contract with C.K.C., Inc. for the <br />accomplishment of Tasks 1 - 13 of the project. If this is not satisfactory, ASE is <br />willing to subcontract Czc.C., Inc for an increased fee equal to 15% of C.KC.'s <br />billings. <br />Sincerely, <br />Kyle C. West, MS, REA <br />Senior Engineer <br />