My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GIBRALTAR
>
4199
>
2200 - Hazardous Waste Program
>
PR0538927
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2020 2:15:45 PM
Creation date
11/1/2018 8:20:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0538927
PE
2220
FACILITY_ID
FA0010089
FACILITY_NAME
STOCKTON LOGISTICS LLC
STREET_NUMBER
4199
Direction
E
STREET_NAME
GIBRALTAR
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
17728055
CURRENT_STATUS
01
SITE_LOCATION
4199 E GIBRALTAR CT
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GIBRALTAR\4199\PR0538927\COMPLIANCE INFO 2018 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2018 - PRESENT
QuestysRecordDate
3/30/2018 6:48:33 PM
QuestysRecordID
3842328
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C&S <br />Wholesale <br />Grocers <br />WAREHOUSE SANITATION PROGRAM <br />BANANA ROOM CLEANING PROCEDURE <br />FREQUENCY: WEEKLY <br />SUPPLIES: BROOM, MOP, SQUEEGEE, SPLASH GOGGLES, WATERPROOF GLOVES, ZEP FS FOAM CHLOR <br />CLEANING SOLUTION, ZEP PAR. <br />EQUIPMENT: POWER WASHER. SCISSOR LIFT. SAFETY HARNESS <br />1) ASSOCIATE SWEEPS BANANA ROOM OF DEBRIS AND PUTS IN TRASH CAN. <br />2) ASSOCIATE PUTS OUT "WET' SIGN UNTIL DRY. <br />3) CHECK THAT THE DRAIN AND GRATE ARE FREE OF DEBRIS. <br />4) MUST REMOVE CHEMICAL SOLUTION BOX, PLACING IT WELL OUTSIDE OF ROOM SO IT DOES NOT GET <br />WET. <br />5) ENGINEERS MUST TAPE OFF WITH PLASTIC THE MOTOR UNIT AT TOP OF ROOM... DO NOT POWER <br />WASH UNTIL THIS IS COMPLETED. <br />6) ASSOCIATE PULLS DRAIN COVER FROM DRAIN AND EMPTIES DRAIN BASKET INTO TRASH CAN, THEN <br />REPLACES DRAIN BASKET AND DRAIN COVER. <br />7) ASSOCIATE SPRAYS SIDES, BUMPERS, WALLS, CEILING, FLOOR, FRONT AND BACK OF BLUE TARPS, <br />ETC. WITH PROPER ZEP FS FOAM CHLOR SOLUTION, FOAMING FROM BOTTOM TO TOP. <br />8) ASSOCIATE RINSES FOAM WITH CLEAR WATER, RINSING FROM TOP TO BOTTOM. DO NOT ALLOW <br />FOAM TO DRY BEFORE RINSING. <br />9) ASSOCIATE APPLIES ZEP PAR SILICONE SPRAY TO BLACK BUMPERS. <br />10) ASSOCIATE THEN REPEATS THE STEPS FOR ALL OF BANANA ROOM. <br />11) ASSOCIATE PULLS DRAIN COVER FROM DRAIN AND EMPTIES DRAIN BASKET INTO TRASH CAN AGAIN, <br />THEN REPLACES DRAIN BASKET AND DRAIN COVER. <br />12) ASSOCIATE FOAMS DRAIN, AND THEN RINSES WITH CLEAR WATER. <br />13) SUPERVISOR AND ASSOCIATE CHECK THE WORK AND BOTH SIGN OFF ON THE CLEANING SHEET. <br />SEP 0 3 2015 <br />ENVIRONMENi'A, <br />W 0761-ru P\�C)n DTI/CMT <br />SA.002.PR.97.04 22 revised 06/22/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.