Laserfiche WebLink
Jose L. Perez <br />17 February 2009 <br />Page 2 <br />depth of approximately 45 feet below grade. The second borehole will measure 15 inches in <br />diameter and will be drilled to a depth of approximately 85 feet below grade. The boreholes will be <br />completed as a 2 -inch -diameter groundwater monitoring wells. The wells will be secured with <br />locking caps and completed at the surface with flush mounted, traffic rated, steel well boxes. <br />The work is expected to take approximately 4 days. All materials generated during drilling activities <br />will be stored at the former service station property. <br />As required by the CRWQCB-CVR, the well will be sampled every three months. The sampling will <br />require our technician to be onsite for approximately 1 day. All equipment and materials used for <br />sampling will be removed from your site upon completion of the work. We will make every attempt <br />to minimize the impact to you or your tenants and will send notification prior to the installation of <br />the well. ETIC will be responsible for any damage that may be caused to your property as a result of <br />and limited to the borehole drilling. After completion of the project, the well will be removed <br />according to the applicable well standards and the drilling location will be properly resurfaced to <br />match the surrounding conditions. <br />0Access\9 S- 3330 N M D.M. Sum d. <br />