My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
75
>
2900 - Site Mitigation Program
>
PR0526874
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 4:08:21 PM
Creation date
11/1/2018 8:31:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0526874
PE
2960
FACILITY_ID
FA0018201
FACILITY_NAME
FORMER MOBIL SERVICE STATION 99-CAS
STREET_NUMBER
75
Direction
E
STREET_NAME
ALPINE
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
11514007
CURRENT_STATUS
01
SITE_LOCATION
75 E ALPINE AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Robert A. Sullivan <br />21 May 2007 <br />Page 2 <br />The groundwater monitoring well will be installed using a truck -mounted rotary drill rig equipped <br />with hollow -stem augers. The boreholes will measure 8.25 inches diameter and will be drilled to a <br />depth of approximately 45 feet below grade. The borehole will be completed as a 2 -inch -diameter <br />groundwater monitoring well. The well will be secured with a locking cap and completed at the <br />surface with a flush mounted, traffic rated steel well box. <br />The work is expected to take approximately 1 day. All materials generated during drilling activities <br />will be stored at the former service station property. <br />As required by the CRWQCB-CVR, the well will be sampled every three months. The sampling will <br />require our technician to be onsite for approximately 1 day. All equipment and materials used for <br />sampling will be removed from your site upon completion of the work. We will make every attempt <br />to minimize the impact to your tenants and will notify them prior to the installation of the well. <br />ETIC will be responsible for any damage that may be caused to your property as a result of and <br />limited to the borehole drilling. After completion of the project, the well will be removed according <br />to the applicable well standards and the drilling location will be properly resurfaced to match the <br />surrounding conditions. <br />G TrojmtW-CASTublic�C=S�Ot6uc Ac X99 -CAS -MO N EI Dorado Sv A., <br />
The URL can be used to link to this page
Your browser does not support the video tag.