My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
75
>
2900 - Site Mitigation Program
>
PR0526874
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 1:28:00 PM
Creation date
11/1/2018 8:32:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0526874
PE
2960
FACILITY_ID
FA0018201
FACILITY_NAME
FORMER MOBIL SERVICE STATION 99-CAS
STREET_NUMBER
75
Direction
E
STREET_NAME
ALPINE
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
11514007
CURRENT_STATUS
01
SITE_LOCATION
75 E ALPINE AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^'ri.-i�ao ii•vo Ubf LLEHNUN FUND 916 227 4530 P.03/06 <br /> REMOVAL OF DEBRIS AND SOIL FROM EXCAVATION <br /> 11/10/45AIso includes temporary fencing and cost of off haul & disposal . <br /> Make arrangements with Geo Analytical Laboratories <br /> and meet their sampler at the site to sample the <br /> spoil pile. Direct sampling of spoil pile . <br /> JIM THORPE OIL PERSONNEL: <br /> M L Thorpe, supervisor 3 hrs 0 $ 75.00/hr 225 .00 <br /> Geo Analytical Laboratories, Inc. <br /> Spoil pile sampling and analyses for 8270 - <br /> 3 samples taken and composited into 1 sample <br /> ( includes sampling time, compositing & mileage) <br /> cost 1 sample 0 $522. 25 = $22. 25 <br /> plus 24 hr turn-around 522. 25 <br /> (Analyses used to profile spoil ) 1 ,044.50 ✓ <br /> Plus Jim Thorpe Oil 20% 208. 90 1 ,253 .40 <br /> 11/11/95 <br /> Haul fence panels to site. Set up Jim Thorpe Oil and <br /> Previous contractor 's fence around site perimeter. <br /> JIM THORPE OIL PERSONNEL: <br /> M L Thorpe, supervisor 2 hrs 0 $ 75.00/hr 150. 00 <br /> M J Thorpe, foreman 4 hrs 0 $ 50.00/hr 200.00 <br /> R M Thorpe, laborer 4 hrs 0 $ 45.00/hr 180.00 <br /> JIM THORPE OIL EQUIPMENT <br /> Fence 6 panels 0 $ 13.00/ea 78.00 <br /> Truck & trailer 2 hrs 0 $ 40. 00/hr 80.0D <br /> 11/13/45 <br /> Move in Jim Thorpe Oil backhoe. <br /> JIM THORPE OIL PERSONNEL: <br /> S S berg, driver 1 hr 0 $ 45.00/hr 45 .00 <br /> JIM THORPE OIL EQUIPMENT: <br /> Dump Truck & trailer 1 hr 0 $ 35. 00/hr 35.00 <br /> Move in Jim Thorpe Oil excavator. <br /> Kammerer Vineyards-Trucking company <br /> cost=2.25 hrs 0 $ 60.00/hrs 135 .0 <br /> Plus Jim Thorpe Oil 20% 0 162.00 <br /> Remove balance of previous contractor's fence panels <br /> from excavation. Remove debris (weeds, etc. ) <br /> from excavation and place with stockpiled spoil . <br /> JIM THORPE OIL PERSONNEL: <br /> R J Thorpe , equip. oper. 7 hrs 0 $ 55.00/hr 385.00 <br /> M J Thorpe, equip. oper. 8 hrs 0 $ 50.00/hr 400.00 <br /> JIM THORPE OIL EQUIPMENT: <br /> Excavator .875 day 0 $500.00/day 437. 50 <br /> Backhoe 1 day 0 $300.00/day 300.00 <br /> PERSONAL & CONFIDENTIAL Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.