My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
75
>
2900 - Site Mitigation Program
>
PR0526874
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 1:28:00 PM
Creation date
11/1/2018 8:32:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0526874
PE
2960
FACILITY_ID
FA0018201
FACILITY_NAME
FORMER MOBIL SERVICE STATION 99-CAS
STREET_NUMBER
75
Direction
E
STREET_NAME
ALPINE
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
11514007
CURRENT_STATUS
01
SITE_LOCATION
75 E ALPINE AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
\ 4 <br /> DUTIES AND RESPONSIBILITIES OF THE SPECIAL INSPECTOR <br /> 1. The special inspector shall observe the work assigned for <br /> conformance with the approved design drawings and <br /> specifications . <br /> 2. The special inspector shall furnish inspection reports to the <br /> building official, the engineer or architect of record, and <br /> other designated persons. All discrepancies shall be brought <br /> to the immediate attention of the contractor for correction, <br /> then, if uncorrected, to the proper design authority and to <br /> the building official. <br /> 3 . The special inspector shall submit a final signed report <br /> stating whether the work requiring special inspection was, to <br /> the best of .the inspector's knowledge, in conformance with the <br /> approved plans and specifications and the applicable <br /> workmanship provisions of this code. <br /> The undersigned owner who has contracted with your firm to perform <br /> the above-mentioned special inspections and/or tests hereby <br /> authorizes and directs you to forward a copy of any and all reports <br /> and test results directly to the City of Stockton, Community <br /> Development Department/Building Division. <br /> JOHN CARLSON, DIRECTOR <br /> COMMUNITY DEVELOPMENT DEPARTMENT <br /> 0 IT PEC ON AGENCY <br /> of/ubc91 <br /> R-11/3/92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.