My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
75
>
2900 - Site Mitigation Program
>
PR0526874
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 1:28:00 PM
Creation date
11/1/2018 8:32:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0526874
PE
2960
FACILITY_ID
FA0018201
FACILITY_NAME
FORMER MOBIL SERVICE STATION 99-CAS
STREET_NUMBER
75
Direction
E
STREET_NAME
ALPINE
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
11514007
CURRENT_STATUS
01
SITE_LOCATION
75 E ALPINE AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> FOOTHILL <br /> ENGINEERING <br /> 12793 PADDY CREEK LANE LODI, CA 95240 <br /> PH. (209)368-9381 FAX(209) 367-1163 <br /> November 3, 1995 <br /> Environmental Health Division 1392ing <br /> San Joaquin County Public Health Services NOVU <br /> Stockton, CA 6 1995 <br /> ENVIRONMENTAL H <br /> RE: Proposal for Backfill of the Excavation Located on the Northwest Comer IM <br /> b IT/ SERVICES <br /> El Dorado & Alpine Streets, Stockton, CA <br /> Ladies and Gentlemen, <br /> Please find below the requested proposal for the backfill of the excavation resulting from the removal <br /> of the underground tanks on the corner of Alpine and EI Dorado Streets in Stockton. <br /> SCOPE OF WORK <br /> Foothill Engineering proposes to clear the vegetation and other deleterious materials from the past <br /> tank removal at the above stated location. The excavated area will be prepared to receive engineered <br /> fill as required by the City of Stockton. Low permeability fill material will be placed in six inch lifts <br /> and compacted to City of Stockton standards. The finished grade of the backfilled area will be shaped <br /> to drain to the street to prevent ponding. <br /> ESTIMATED COST <br /> Item Description Estimated Quantity Unit Price <br /> 1 Mobilization L.S. $1,000 <br /> 2 Clearing L.S. $ 500 <br /> 3 Imported Fill 400 CY $ 12.00/CY <br /> 4 Place& Compact Fill 400 CY $ 5.00/CY <br /> 5 Soil Samples 6 ea. $ 200/ea. <br /> (EPA 8015,8020) <br /> 6 Load& Haul Stockpiled <br /> Excavated Material 300 ton $ 10.00/ton <br /> 7 Dump Fee 300 ton Subject to Profile <br /> 8 Engineering As directed Cost Plus 15% <br /> MEASUREMENT OF QUANTITIES <br /> Final pay quantities are actual measured quantities. Imported fill material is measured by truck <br /> measurement. Measurement of quantities for hauling and dump fees are by scale weight. <br />
The URL can be used to link to this page
Your browser does not support the video tag.