My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
75
>
2900 - Site Mitigation Program
>
PR0526874
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 10:48:26 AM
Creation date
11/1/2018 8:33:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0526874
PE
2960
FACILITY_ID
FA0018201
FACILITY_NAME
FORMER MOBIL SERVICE STATION 99-CAS
STREET_NUMBER
75
Direction
E
STREET_NAME
ALPINE
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
11514007
CURRENT_STATUS
01
SITE_LOCATION
75 E ALPINE AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sample Condition Water Levels <br />® No Recovery _M After Completion: 34 <br />Q Interval Not Sampled During Drilling: <br />Described Sample <br />_y a ®Preserved Sample <br />a a ? U <br />a i2 C U a DESCRIPTION <br />5 <br />10 <br />15 <br />it 1 30 <br />0 <br />Q <br />x <br />LU <br />J_ <br />00 <br />0 <br />2 <br />0 35 <br />x <br />x <br />w_ <br />J <br />N <br />4 <br />40 <br />Well: SVE1 <br />Cover <br />Type II <br />Neat Cement <br />2" Schedule 40 <br />PVC <br />Bentanite <br />##3 Sand <br />2" PVC <br />0.020 slotted <br />screen <br />Date Drilled: <br />: 11 <br />CrdoWood <br />an <br />BORING LOG SVE1 <br />Drilling Co.: <br />:Woodward Drilling Co. <br />ER/ <br />Drilling Method: <br />Hollow Stem <br />Sampling Method: <br />: Split Spoon <br />Shaping the Future <br />Borehole Diameter: <br />Casing Diameter: <br />: 8" <br />: 2" <br />Project No.: : Former Mobil Service Station 99CAS <br />Site: <br />: 75 E. Alpine Avenue, Stockton, CA <br />Location N -S <br />24' North of DW3 <br />Logged By: <br />: Rebekah A. Westrup <br />Location E -W <br />: 1' East of DW3 <br />Reviewed By: <br />D. Cja� 877 <br />Total Depth: <br />: 40' <br />Signature: <br />[J fir,/ <br />First GW Depth: <br />Sample Condition Water Levels <br />® No Recovery _M After Completion: 34 <br />Q Interval Not Sampled During Drilling: <br />Described Sample <br />_y a ®Preserved Sample <br />a a ? U <br />a i2 C U a DESCRIPTION <br />5 <br />10 <br />15 <br />it 1 30 <br />0 <br />Q <br />x <br />LU <br />J_ <br />00 <br />0 <br />2 <br />0 35 <br />x <br />x <br />w_ <br />J <br />N <br />4 <br />40 <br />Well: SVE1 <br />Cover <br />Type II <br />Neat Cement <br />2" Schedule 40 <br />PVC <br />Bentanite <br />##3 Sand <br />2" PVC <br />0.020 slotted <br />screen <br />
The URL can be used to link to this page
Your browser does not support the video tag.