Laserfiche WebLink
z <br />0 <br />m <br />a <br />U <br />0 <br />s <br />0 <br />Y <br />0 <br />U) <br />a <br />0 <br />c <br />0 <br />X <br />W <br />J <br />m <br />0 <br />z <br />0 <br />O <br />w <br />J <br />0 <br />M <br />5--1 1 1 V111 a ML <br />1 <br />1 <br />20 <br />ML <br />Boring cleared to 6 feet bgs, on 8/15/2011 using hand tools and <br />vacuum equipment. <br />— — — — — — — — — — — — — — — — — <br />Silty CLAY with Sand: gray -brown, dry, fine-grained and <br />angular sand (50,35,15,0) <br />- — — — — — — — — — — — — — — — — <br />CLAY with Silt: yellow-brown, dry, low plasticity (80,20,0,0) <br />SILT with Clay: light brown, dry (20,80,0,0) <br />Well 1: AS3D <br />We112: AS3S <br />'n&]6'Lq7 <br />ype II <br />leat Cement <br />" Schedule 80 <br />VC <br />" Schedule 80 <br />VC <br />Date Drilled: <br />: 09/20/11 <br />4;�J7 C"Sdno <br />BORING LOG AS3S/D <br />Drilling Co.: <br />: Woodward Drilling Co. <br />ER/ <br />V After Completion: n/a <br />Drilling Method: <br />: Hollow Stem <br />s"ingthoFulmm <br />Q Interval Not Sampled <br />Sampling Method: <br />: Split Spoon <br />Borehole Diameter: <br />Casing Diameter: <br />: 10" <br />: 1" <br />Project No.: : Former Mobil Service Station 99CAS <br />Site: <br />:75 E. Alpine Avenue, Stockton, CA <br />Location N -S <br />: 9' South of DW3 <br />Logged By: <br />: Rebekah A. Westrup <br />Location E -W <br />: 16' West of DW3 <br />Reviewed By:❑ <br />�ary'els <br />Total Depth: <br />: 76' <br />Signature: <br />r737 <br />L1 <br />First GW Depth: <br />: 36' <br />5--1 1 1 V111 a ML <br />1 <br />1 <br />20 <br />ML <br />Boring cleared to 6 feet bgs, on 8/15/2011 using hand tools and <br />vacuum equipment. <br />— — — — — — — — — — — — — — — — — <br />Silty CLAY with Sand: gray -brown, dry, fine-grained and <br />angular sand (50,35,15,0) <br />- — — — — — — — — — — — — — — — — <br />CLAY with Silt: yellow-brown, dry, low plasticity (80,20,0,0) <br />SILT with Clay: light brown, dry (20,80,0,0) <br />Well 1: AS3D <br />We112: AS3S <br />'n&]6'Lq7 <br />ype II <br />leat Cement <br />" Schedule 80 <br />VC <br />" Schedule 80 <br />VC <br />Sample Condition <br />Water Levels <br />® No Recovery <br />V After Completion: n/a <br />Q Interval Not Sampled <br />_3 During Drilling: 37' <br />c <br />Described Sample <br />� <br />n <br />4 <br />n <br />® Preserved Sample <br />r <br />o <br />E <br />N <br />n] <br />? <br />DESCRIPTION <br />0 <br />--— — — — — — — — — — — <br />3inches of Asphalt <br />GW— ------------— <br />GRAVEL with Sand: fine- to coarse-grained, brown, dry, <br />subangular to angular, fine- to coarse-grained subangular sand <br />ML FILL] (0,0,40,60) <br />Sandy SILT: brown, dry, fine- to medium -grained and angular <br />sand (0,65,35,0) <br />r/lo/z <br />Clayey SILT: brown, dry, non -plastic, trace fine-grained and <br />angular sand (35,60,5,0) <br />5--1 1 1 V111 a ML <br />1 <br />1 <br />20 <br />ML <br />Boring cleared to 6 feet bgs, on 8/15/2011 using hand tools and <br />vacuum equipment. <br />— — — — — — — — — — — — — — — — — <br />Silty CLAY with Sand: gray -brown, dry, fine-grained and <br />angular sand (50,35,15,0) <br />- — — — — — — — — — — — — — — — — <br />CLAY with Silt: yellow-brown, dry, low plasticity (80,20,0,0) <br />SILT with Clay: light brown, dry (20,80,0,0) <br />Well 1: AS3D <br />We112: AS3S <br />'n&]6'Lq7 <br />ype II <br />leat Cement <br />" Schedule 80 <br />VC <br />" Schedule 80 <br />VC <br />