My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
1235
>
3500 - Local Oversight Program
>
PR0543389
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 8:34:38 PM
Creation date
11/1/2018 10:32:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543389
PE
3528
FACILITY_ID
FA0004512
FACILITY_NAME
MAJOR STATIONS
STREET_NUMBER
1235
Direction
E
STREET_NAME
ALPINE
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
11533055
CURRENT_STATUS
02
SITE_LOCATION
1235 E ALPINE AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I t <br /> _ 11 <br /> .� <br /> Attachment to the ALPINE AVENUE WIDENING -- <br /> PROJECT INFORMATION SHEET <br /> t. <br /> r <br /> li <br /> PROJECT DESCRIPTION: :f <br /> W/O West Lane - Widen the existing pavement from Of to 22 ' on <br /> the south side in order to provide dual left turn lanes and two <br /> thru lanes in each direction. Widening will be 0.95' full-depth <br /> asphalt concrete. Existing pavement willj�be resurfaced with <br /> 0. 10' asphalt concrete for surface maintenance and to obliterate <br /> i existing pavement marking to facilitate new lane delineation. <br /> A.C. gutter with curb (dike) will be constructed on the south <br /> side for drainage. Drainage will be piped into existing system <br /> at Coronado Avenue and at West Lane. Raised curb median will be <br /> constructed to replace painted median. . Signal system at West <br /> Lane will be modified for split phasing to allow for dual left <br /> turn movement, and new standards placed to accommodate road <br /> widening. In general, the existing C.G. & '; S. on the north side <br /> will remain in place, however, at the following areas, relocation <br /> will be required: <br /> i 1) N.E. Corner of Coronado Avenue provide for two thru <br /> lanes westbound la M! . <br /> 2) N.W. Corner of West Lane - provide for U-turn on <br /> Alpine Avenue <br /> i E O West Lane - Construct raised curb median to restrict left - <br /> turn movements at San Rafael Avenue. Relocate north curb face 2' <br /> north between West Lane and San Rafael Avenuejto allow for <br /> required lane geometrics (sidewalk reduced to '!41 ) . Resurface <br /> existing pavement with 0. 10' asphalt concretes:four surface <br /> maintenance and to obliterate existing pavement marking to _ <br /> IE facilitate new lane delineation. <br /> i <br /> 3�# <br /> it <br /> i& <br /> I� <br /> I� <br /> d:\wp51\p5.\a1pi.ne <br /> i� <br /> i� <br /> F <br /> i� <br />
The URL can be used to link to this page
Your browser does not support the video tag.