My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
1235
>
3500 - Local Oversight Program
>
PR0543389
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 8:34:38 PM
Creation date
11/1/2018 10:32:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543389
PE
3528
FACILITY_ID
FA0004512
FACILITY_NAME
MAJOR STATIONS
STREET_NUMBER
1235
Direction
E
STREET_NAME
ALPINE
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
11533055
CURRENT_STATUS
02
SITE_LOCATION
1235 E ALPINE AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT DESCRIPTION DEC 0 7 1992 <br /> SOIL REM IDIATION <br /> FORMER MAJOR MART GASOLINE STATION E1VVIRONMENTA>r HEA13-H <br /> PERMITlsE7VIC-3 <br /> 3� <br /> INTRODUCTION <br /> _ � M <br /> Recent investigations of shallow soils onsite have shown thati <br /> gasoline components currently <br /> remain only in a corner of the bottom of the tank excavation ;pit and perhaps in a portion of the <br /> soil stored on the east part of the property which came from the'original tank removal. An <br /> excavation and investigation project is now planned to remove these'impacted soils and complete <br /> the portion of the project focused on the shallow soils by filling the excavation to the surface. <br /> Future work, if any, will involve below grade drilling which will not materially impact the <br /> surface of the site. i6 <br /> I� <br /> i <br /> PROJECT DESCRIPTION � <br /> The excavation and site restoration will be completed as follows: <br /> • The existing soil stockpile will be sampled further to determine if gasoline components <br /> remain in the soil. Limited prior work indicates little to no gasoline residues are now <br /> present in the soil. If the soil.is free of gasoline residues p it will be used for filling in <br /> the excavation pit. If residues remain, the soil will be hauled offsite for treatment. <br /> • After sampling, the stockpile will be temporarily r�elocated to the south edge of the <br />'4 property to provide access to the existing pit by excavation equipment. <br /> I <br /> j The excavation will be deepened to a maximum of 40 feat below grade (if necessary) to <br /> remove soils having gasoline residues. The soil removed 'will. be classified by a mobile <br /> laboratory onsite and hauled away to an appropriate disposal site. A review of soil <br /> stability has been completed to assure excavation to'#the target depth will not affect any <br /> nearby buildings. <br /> • During the excavation, air monitoring will be conducted to assure no significant <br /> emmissions of gasoline residues are released. If such em;nussions are identified, work <br /> will cease and the excavation will be covered. Appropriate measures will then be taken <br /> to control any emissions prior to continuing the excavation. <br /> • After the-completion of the excavation work, the tL pith will be filled with clean soil <br /> either from the existing stockpile or from an offsite source) and the area paved with <br /> { kP <br /> asphalt. <br /> SII <br /> SCHEDULE <br /> Preparations for the excavation work is expected to take two days and the actual excavation one <br /> day. Soil removal is expected to require a maximum of two days. 'fBackfill of the excavation <br /> pit will require two days and grading of the area and paving ' <br /> will require two days. As some <br /> coordination time is expected, the entire project should require a total of twelve working days <br /> with intensive work occupying only three to four days. Allwork'will be conducted during <br /> daylight hours on weekdays. - <br />
The URL can be used to link to this page
Your browser does not support the video tag.