Laserfiche WebLink
PROJECT DFSCRIP'IZON: DEC 0 ?' 1992 <br /> IATION <br /> SOIL REyIED <br /> FORMER N OR (MART GASOLINE STATION ENVIRONMENTAL HEALTH <br /> PERMITISERVIC-3 <br /> 1 'I <br /> I t MODUCTION <br /> Recent investiations of shallow soils onsite have shown that gasoline components currently <br /> remain only in a corner of the bottom of the tank excavation pit and perhaps in a portion of the <br /> soil stored on the east part of the property which came from the:';original tank removal. An <br /> excavation and investigation project is now planned to remove,}these impacted soils and complete <br /> the portion of the project focused on the shallow soils by filling the excavation to the surface. <br /> Future work, if any, will involve below grade drilling which will not materially impact the <br /> surface of the site. if <br /> PROJECT DESCRIPTION <br /> The excavation and site restoration will be completed as follows: e <br /> • The existing soil stockpile will be sampled further to determine if gasoline components <br /> remain in the soil. Limited prior work indicates lithe to no gasoline residues are now <br /> present in the soil. If the soil is free of gasoline residues,1,1 it will be used for filling in <br /> the excavation pit. If residues remain, the soil will tie hauled offsite for treatment. <br /> • the stockpile will be temporarily located to the south edge of the <br /> After sampling, kp Po Y <br /> property to provide access to the existing pit by excavation equipment. <br /> !E <br /> • The excavation will be deepened to a maximum of 40 feet below grade (if necessary) to <br /> remove soils having gasoline residues. The soil removed will be classified by a mobile <br /> laboratory onsite and hauled away to an appropriate disposal site. A review of soil <br /> stability has been completed to assure excavation to'the target depth will not affect any <br /> nearby buildings. <br /> During the excavation, air monitoring will be c�ondu ivied to assure no significant <br /> ` emmissions of gasoline residues are released. If such em�missions are identified, work <br /> will cease and the excavation will be covered. Appropriate measures will then be taken <br /> to control any emissions prior to continuing the excavation. <br /> 'I <br /> Aber the-completion of the excavation work, the tajnk pi <br /> will be filled with clean soil <br /> (either from the existing stockpile or from an offsite soyrce) and the area paved with <br /> asphalt. lip <br /> ;1 <br /> SCFIEDULE F <br /> Preparations for the excavation work is expected to take two days and the actual excavation one <br /> day. Soil removal is expected to require a maximum of two days. 11 Backfill of the excavation <br /> pit will require two days and grading of the area and paving will require two days. As some <br /> coordination time is expected, the entire project should require a total of twelve working days <br /> with intensive work occupying only three to four days. All work will be conducted during <br /> daylight .tours on weekdays. <br />