Laserfiche WebLink
3.1.4 Public Advisory <br />Per the request of the San Joaquin County EHD, WESTON developed a summary description <br />of the Magor Mart soil remediation project for distribution to residents in the vicinity of the site <br />The EHD distributed the description within the local community and, as there was no significant <br />public comment, no public meeting was required <br />3.2 Future Planned Activities <br />In chronological order, the following activities are currently planned. <br />February 1993 <br />• Complete additional excavation of former tank pit. <br />• Remove impacted soils from site <br />• Fill and compact tank excavation. <br />• Resurface site with crushed rock. <br />March 1993 <br />D Conduct first quarter groundwater monitoring event. <br />srxcqkrrsWEcaQrR wr <br />10 atn6m <br />