' On March 12, 1993, site activities consistedco lR ch f sol transportation A total of fourteen <br /> truck loads of soil were removed to the Rem Y <br /> ard <br /> t Work did not resume at the site until March 16, 1993 On the prior day, March 15, 1993, the <br /> analytical results for the twelve confirmation soil samples were received from the laboratory <br /> (Table �} and permission from the EHD to close the excavation had been obtained Therefore, <br />' backfilling of the excavation with pea gravel commenced to conjunction with the removal of the <br /> the <br /> remainder of the on-site impacted soil A total o eight of the ruck d removed s of tws itere s to s 805 8ported t�ons <br /> Remco Richmond facility bringing the total g <br />' (approximately 596 5 cuyds) <br /> On March 17, 1993, the backfilling of the excavation was completed with pea gravel to within <br /> five feet of the surface. A geo-membrane lineagplacedtto backfill as eon ll of texcavatione gravel. A total <br /> of 1089 47 tons (871 58 cuyds) of pea gravel <br /> e <br />' On March 1$, 1993, the excavation area wasbackfilledcke with <br /> tTh�s soil was segregated ompacted from <br /> and the <br /> original excavation stockpile and the overburdenstock- <br /> pile <br /> eastern portion of the site was covered with the layer of crushed rock. <br /> 1 <br /> 1 <br /> ' C - 10 �13/I7'93 <br /> S \ItPTMREGIQTR WP - - <br />