My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINDSAY
>
1533
>
2200 - Hazardous Waste Program
>
PR0521335
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2019 11:38:01 AM
Creation date
11/1/2018 11:02:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO_PRE 2019
FileName_PostFix
PRE 2019
RECORD_ID
PR0521335
PE
2227
FACILITY_ID
FA0003749
FACILITY_NAME
SJ REGIONAL TRANSIT
STREET_NUMBER
1533
Direction
E
STREET_NAME
LINDSAY
STREET_TYPE
ST
City
STOCKTON
Zip
952054498
APN
15302004
CURRENT_STATUS
02
SITE_LOCATION
1533 E LINDSAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LINDSAY\1533\PR0521335\COMPLIANCE INFO 2000-2009.PDF
QuestysFileName
COMPLIANCE INFO 2000-2009
QuestysRecordDate
3/24/2016 5:51:06 PM
QuestysRecordID
3038131
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
555
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NALP <br /> • SSon)Owgnin Regional Tra slt brst"ct <br /> Table 1-Waste Minimization Team Members Responsibility <br /> Matrix <br /> SJRTD EHS/WM Team Roles and Responsibilities P2/BMP/WM Duties and <br /> Members Res onsibilities <br /> 1. Director of Maintenance Overall EHS/WM Program . Signs and certifies the <br /> Implementation Authority and SB 14 Plans <br /> Certifications of the SB 14 0 Ensures WM <br /> Plans compliance by all <br /> SJRTD employees <br /> and Departments with <br /> the WM plan <br /> Authorizes resources <br /> and funding for the <br /> overall compliance <br /> with the WM <br /> Resolves WM/source <br /> reduction issues <br /> 2. Facilities Dept: Orchestrates the Overall WM . Ensures that all WM <br /> Superintendent/Supervisor Efforts and Requirements measures are properly <br /> . functioning and are <br /> effective <br /> Tracks the <br /> performance of the <br /> WM measures <br /> • Conducts in house <br /> multimedia <br /> inspections and audits <br /> to ensure compliance <br /> and implementation of <br /> the WM <br /> Ensures that the EHS <br /> committee is held <br /> quarterly and WM <br /> issues are tabled, <br /> discussed and <br /> resolved <br /> • Ensures that the WM <br /> plan is properly <br /> implemented, revised <br /> and filed with the <br /> DTSC every four <br /> years. <br /> Ensures that a copy of <br /> the most up to date <br /> WM plan is properly <br /> maintained on site for <br /> • the SJCEHD viewing <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.