My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINDSAY
>
1533
>
2200 - Hazardous Waste Program
>
PR0521335
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2019 11:38:01 AM
Creation date
11/1/2018 11:02:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO_PRE 2019
FileName_PostFix
PRE 2019
RECORD_ID
PR0521335
PE
2227
FACILITY_ID
FA0003749
FACILITY_NAME
SJ REGIONAL TRANSIT
STREET_NUMBER
1533
Direction
E
STREET_NAME
LINDSAY
STREET_TYPE
ST
City
STOCKTON
Zip
952054498
APN
15302004
CURRENT_STATUS
02
SITE_LOCATION
1533 E LINDSAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LINDSAY\1533\PR0521335\COMPLIANCE INFO 2000-2009.PDF
QuestysFileName
COMPLIANCE INFO 2000-2009
QuestysRecordDate
3/24/2016 5:51:06 PM
QuestysRecordID
3038131
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
555
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Chapter 3 Compliance Deadlines <br /> 3.1 Dates to Remember <br /> SB 14 requires generators to prepare SB 14 documents on or before September 1, <br /> 1991 and every four years thereafter, when the generation of hazardous waste or <br /> extremelyhazardous waste exceeds the corresponding applicability threshold during <br /> a reporting year.For the most recent four year period,the required SB 14 documents <br /> are the Plan,Performance Report,and Summary Progress Report(SPR). The three <br /> documents are to be prepared for the 2002 reporting year. <br /> 3.2 Mandatory Summary Progress Report Submital <br /> The requirement to prepare and submit an SPR to OPPTD applies to all generators <br /> subject to SB 14. The SPR must be submitted to OPPTD by September 1, 2003. <br /> Details on preparing and submitting an SPR are provided in Chapter 7. <br /> 3.3 New Owner <br /> If a generator acquires a site that has an existing set of source reduction documents, <br /> • the new owner has six months to amend the documents. If the new owner does not <br /> amend the documents within six months, the existing documents, including the <br /> selected source reduction measures and numerical goal,will continue to apply to the <br /> site. The new owner is also responsible for the implementation of the selected <br /> measures according to the existing implementation schedule. <br /> 4 >• <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.