My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINDSAY
>
1533
>
2200 - Hazardous Waste Program
>
PR0521335
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2019 11:38:01 AM
Creation date
11/1/2018 11:02:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO_PRE 2019
FileName_PostFix
PRE 2019
RECORD_ID
PR0521335
PE
2227
FACILITY_ID
FA0003749
FACILITY_NAME
SJ REGIONAL TRANSIT
STREET_NUMBER
1533
Direction
E
STREET_NAME
LINDSAY
STREET_TYPE
ST
City
STOCKTON
Zip
952054498
APN
15302004
CURRENT_STATUS
02
SITE_LOCATION
1533 E LINDSAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LINDSAY\1533\PR0521335\COMPLIANCE INFO 2000-2009.PDF
QuestysFileName
COMPLIANCE INFO 2000-2009
QuestysRecordDate
3/24/2016 5:51:06 PM
QuestysRecordID
3038131
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
555
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 7 The Summary Progress Report <br /> 7.1 Completing the Summary Progress Report <br /> Generators subject to SB 14,are required to prepare and submit a Summary Progress <br /> Report to DTSC by September 1, 2003. SB 14 legislation mandates the submittal <br /> starting September 1, 1999,and every four years thereafter.The submittal is done on <br /> DTSC Form 1262, provided in this subsection_ The form is also available on the <br /> DTSC website listed in this chapter. <br /> DTSC Form 1262, "Summary Progress Report"(SPR),now consists of Table I <br /> and Table 2.In order to simplify the form,this latest edition SPR is a revision of the <br /> previous SPR.Revisions include specific instructions that are integrated into Tables <br /> 1 and 2. Generators should read all the instructions integrated into the latest SPR form <br /> very carefully before completing Tables I and 2. All SB 14 generators,including <br /> small businesses,are required to submit the SPR to DTSC by September 1,2003. <br /> The SPR requires quantitative data and some narrative description. If you are a <br /> generator subject to SB 14,you are required to include this information in your SPR <br /> forthe period 1998-2002.This is your opportunity to document your source reduction <br /> successes over the last four years or longer if information is available. <br /> Table 1 provides for general information and total hazardous waste generation data <br /> for 1998 and 2002. Table 1 also requests a brief summary of and comments on your <br /> organization's historical source reduction successes and waste management practices. <br /> Your comments can also include reuse,recycling,treatment,and disposal activities. <br /> If more space is needed for comments,please add a separate page to provide complete <br /> information.Since the information requested in Table 1 is for the entire facility,Table <br /> 1 is only completed once for each site. <br /> Table 2 addresses accomplishments by specific waste stream,as achieved over the <br /> last four year period 1999-2002.This information can be obtained from your 2002 <br /> Performance Report. Table 2, Section 25 addresses projections by specific waste <br /> stream covering the next four year period,2403-2006.Use your 2002 Plan to obtain <br /> information for Section 25. Since the information required forTable 2 is waste stream <br /> specific,a separate Table 2 must be completed for each major waste stream and for <br /> each minor waste stream for which a source reduction measure was selected. <br /> Before completing your SPR, please note the following: <br /> • If a generator was required to submit an SPR for 1998 and is also required to <br /> submit one for 2002,the generator must provide all information requested in <br /> both Tables I and 2. <br /> i <br /> ;T <br />
The URL can be used to link to this page
Your browser does not support the video tag.