Laserfiche WebLink
Chapter 7 The Summary Progress Report <br /> 7.1 Completing the Summary Progress Report <br /> Generators subject to SB 14,are required to prepare and submit a Summary Progress <br /> Report to DTSC by September 1, 2003. SB 14 legislation mandates the submittal <br /> starting September 1, 1999,and every four years thereafter.The submittal is done on <br /> DTSC Form 1262, provided in this subsection_ The form is also available on the <br /> DTSC website listed in this chapter. <br /> DTSC Form 1262, "Summary Progress Report"(SPR),now consists of Table I <br /> and Table 2.In order to simplify the form,this latest edition SPR is a revision of the <br /> previous SPR.Revisions include specific instructions that are integrated into Tables <br /> 1 and 2. Generators should read all the instructions integrated into the latest SPR form <br /> very carefully before completing Tables I and 2. All SB 14 generators,including <br /> small businesses,are required to submit the SPR to DTSC by September 1,2003. <br /> The SPR requires quantitative data and some narrative description. If you are a <br /> generator subject to SB 14,you are required to include this information in your SPR <br /> forthe period 1998-2002.This is your opportunity to document your source reduction <br /> successes over the last four years or longer if information is available. <br /> Table 1 provides for general information and total hazardous waste generation data <br /> for 1998 and 2002. Table 1 also requests a brief summary of and comments on your <br /> organization's historical source reduction successes and waste management practices. <br /> Your comments can also include reuse,recycling,treatment,and disposal activities. <br /> If more space is needed for comments,please add a separate page to provide complete <br /> information.Since the information requested in Table 1 is for the entire facility,Table <br /> 1 is only completed once for each site. <br /> Table 2 addresses accomplishments by specific waste stream,as achieved over the <br /> last four year period 1999-2002.This information can be obtained from your 2002 <br /> Performance Report. Table 2, Section 25 addresses projections by specific waste <br /> stream covering the next four year period,2403-2006.Use your 2002 Plan to obtain <br /> information for Section 25. Since the information required forTable 2 is waste stream <br /> specific,a separate Table 2 must be completed for each major waste stream and for <br /> each minor waste stream for which a source reduction measure was selected. <br /> Before completing your SPR, please note the following: <br /> • If a generator was required to submit an SPR for 1998 and is also required to <br /> submit one for 2002,the generator must provide all information requested in <br /> both Tables I and 2. <br /> i <br /> ;T <br />