Laserfiche WebLink
L2. Large Quantity Generator Requirements: <br /> L2.1. Hazardous Waste Container Management Requirements: <br /> 1.2.2. Proper labeling <br /> I.2.3. Proper dating <br /> 1.2.4. Proper scaling of containers <br /> 1.2.5. Container compatibility with its content <br /> L2.6. Compatible hazardous waste vs. incompatible hazardous wastes <br /> I.2.7. Hazardous waste accumulation for LQG: <br /> 1.2.8. Accumulation time period for LQGs: 90 days vs. SQG: 1801270 <br /> 1.2.9. Proper accumulation of hazardous waste containers: adequate isle spacing <br /> 1.2.10. Accumulation vs. Storage <br /> L3. Recordkeeping for LQG of Hazardous Waste: <br /> I.3.1. Hazardous Waste Manifests: <br /> I.3.2. LDR Notifications/Certifications <br /> I.3.3. Annual report/biennial reports <br /> I.3.4. Waste Analysis <br /> I.3.5. Manifest discrepancy reports <br /> 1.3.6. Exception reports <br /> L4. Emergency Response/Preparedness: <br /> I.4.1. Hazardous Waste Contingency Plan <br /> 1.4.2. Hazardous Waste spill response and notification <br /> L5. Waste Minimization: <br /> 1.5.1. Waste minimization planning and reporting: HSC 25244.4 AND 25244.19 <br /> 1.5.2. Profit through prevention/minimization <br /> 1.5.3. SB 14 review and plan <br /> L6. Universal Waste Management(UWM): <br /> 1.6.1. Principals of UWM <br /> 1.6.2. Types of UW <br /> I.6.3. UWM requirements <br /> 1.7. Hazardous Waste Management Training for LQG: <br /> 1.7.1 Scope of the training <br /> 1.7.2. Annual refreshers <br /> 1.7.3. Train new employees within their first 6 months <br /> Module IL Hazardous_Materials Management: <br /> II.1. California H&S <br /> 11.2. OES requirements <br /> I1.3. HMMP 44 <br />