Laserfiche WebLink
i <br /> SWPPP Requirements: <br /> • The rain event must be one hour in duration, <br /> continuous,and without cessation <br /> • The samples must be taken as close as possible <br /> to the first hour of the rain event <br /> • The samples must be analyzed by a reputable <br /> laboratory which has been certified by the State <br /> of California Health Department <br /> hpil pQ3 <br /> SWPPP Requirements Continued <br /> • SJUD's Best Management Practices(BMPs): <br /> ➢Structural BMPs: <br /> ✓Segregating Sanitary from storm <br /> ✓Dedicated covered Steam clean room <br /> ✓Dedicated covered Bus Wash <br /> ,/Storm drain Insert BMPs <br /> ,/Secondary Containments for Storage of <br /> Significant Materials: Hazardous <br /> Materials/Wastes <br /> _.._ :Ek ✓MI ESUStisT <br /> Z.T:dlt/pr plMol <br /> i4k Ysl erd Vs£ <br /> Apif 31P5 <br /> 7 <br />