My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINDSAY
>
1533
>
2200 - Hazardous Waste Program
>
PR0521335
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2019 11:38:01 AM
Creation date
11/1/2018 11:02:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO_PRE 2019
FileName_PostFix
PRE 2019
RECORD_ID
PR0521335
PE
2227
FACILITY_ID
FA0003749
FACILITY_NAME
SJ REGIONAL TRANSIT
STREET_NUMBER
1533
Direction
E
STREET_NAME
LINDSAY
STREET_TYPE
ST
City
STOCKTON
Zip
952054498
APN
15302004
CURRENT_STATUS
02
SITE_LOCATION
1533 E LINDSAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LINDSAY\1533\PR0521335\COMPLIANCE INFO 2000-2009.PDF
QuestysFileName
COMPLIANCE INFO 2000-2009
QuestysRecordDate
3/24/2016 5:51:06 PM
QuestysRecordID
3038131
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
555
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HAZARDOUS WASTE CONTINGENCY PLAN <br /> For use by Unidocs Member Agencies or where approved by your Local Jurisdiction <br /> Authority Cited: Title 22,California Code of Regulations(CCR)§66165.52 as referenced by§66261.34(a)(4)or 67450.3(c)(9)(C) <br /> Facilities that generate 1,000 kilograms or more of hazardous waste per month, or accumulate more than 6,000 <br /> kilograms of hazardous waste on-site at any one time, must prepare a Contingency Plan. Facilities that generate <br /> in any month more than 1 kilogram of acutely hazardous waste (AHW), or more than 100 kilograms of debris <br /> resulting from the spill of an AHW, or which treat hazardous waste onsite under the Permit by Rule (PBR) <br /> onsite treatment tier must also prepare a Contingency Plan. Many facilities that are required to prepare a <br /> Contingency Plan are already subject to Hazardous Materials Business Plan (HMBP) reporting requirements <br /> due to the quantities of hazardous materials/wastes they have onsite. If you have already prepared a Unidocs <br /> HMBP, or already have a plan which is equivalent in content to the Emergency Reponse/Contingency Plan <br /> module of the Unidocs HMBP, you have satisfied the Contingency Plan requirements and are not required to <br /> complete the blank plan, below. <br /> This site-specific Contingency Plan is the facility's plan for dealing with emergencies and shall be implemented <br /> immediately whenever there is an imminent or actual fire, explosion, or release of hazardous waste or a <br /> hazardous waste constituent which could threaten human health and/or the environment. At least one copy of <br /> the plan shall be maintained at the facility for use in the event of an emergency and for inspection by the <br /> local agency. A copy of the plan and any revisions must be provided to any contractor, hospital, or agency <br /> with whom special(i.e. contractual) emergency services arrangements have been made(see Section E, below). <br /> A. Facility Information: <br /> BUSINESS NAMEBUSINESS PHONE. <br /> n.vi n(L tH RTp Me+vn �c,�ctl,+t� 2or kg- ss t6 <br /> SITE ADDRESS CITY ZIP CODE <br /> 33 LiKdsq.t AvV 5A0 to11 CA- 9SZOS <br /> B. Emergency Coordinators: <br /> All personnel qualified to act as the facility's Emergency Coordinator must be listed in this plan. (Note: <br /> Emergency Coordinator responsibilities are described in Section F, below.) If more than two people are <br /> qualified, list the names, titles, business and 24-hour telephone numbers, and pager numbers of the additional <br /> qualified individuals on an attached page in the order in which they will assume responsibility as alternates, <br /> then check the box beneath the Emergency Coordinator information table, below, and indicate the list's page <br /> number in the space provided. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> C. Evacuation Plan: <br /> 1. The following alarm signal(s)will be used to begin evacuation of the facility(check all that apply): <br /> CR Bells; 'Homs/Sirens; ElVerbal(i.e.,shouting); ElOther(specify <br /> UN-017-1/6 www.unidm&otg Rev.03/27/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.