Laserfiche WebLink
DUDEK Se ASSOCIATES, INC. 605 Third Street <br /> Encinitas,CA 92024 <br /> x_ (619)942-5147• Fax No.(619)632A164 <br /> 450-10 <br /> February 8, 1994 <br /> Mr. Douglas P. O'Neal Ms. Polly Lowry, Assoc. Engineering Geologist <br /> Department of Toxic Substances Control California Regional Water Quality Control Board <br /> California Environmental Protection Agency Central Valley Region <br /> 10151 Croydon Way 3443 Routier Road, Suite A <br /> Sacramento, CA 5827 Sacramento, CA 95827-3088 <br /> Re Proposal to Install Additional Wells at the Kearney KPF Facility, Stockton California <br /> Dear Mr. O'Neal and Ms. Lowry: <br /> Dudek and Associates, Inc. (Dudek)on behalf of Kearney-National Inc.(Kearney)proposes to install <br /> two additional wells and three additional piezometers at the Kearney KPF facility located at 1624 <br /> East Alpine Avenue, Stockton, California (the facility). These wells and piezometers are proposed <br /> both in response to comments made by the Department of Toxic Substances Control (DTSC) at a <br /> meeting at the facility on October 27, 1993, and in order to accelerate the remediation of the <br /> groundwater. Computer simulations predict that the proposed extraction wells may reduce <br /> remediation time by six years. The piezometers will provide better information on groundwater <br /> levels in the middle of the remedial well field during pumping and may assist in understanding the <br /> vertical conductivity between the shallow zone and the upper intermediate zone. <br /> Extraction Wells <br /> Dudek proposes to install two additional extraction wells in the upper intermediate zone of the <br /> aquifer in the vicinity of well KI-5. These wells will be installed approximately 50 feet northwest <br /> and 100 feet southwest of well KI-5 (Figure 1). It is intended that these additional extraction wells <br /> will also extract water from the same sand lens that well KI-5 does. According to the lithologic log <br /> of exploratory borehole KSH-3 located adjacent to well KI-5, this sand lens is located between <br /> approximately 92 feet below land surface (bls) and 108 feet bls (Attachment 1). <br /> The proposed extraction wells will be constructed of four inch internal diameter PVC casing <br /> installed in approximately 10.5-inch diameter boreholes (Figure 2). The wells will be drilled using <br /> conventional mud rotary methods. The wells will be constructed with 15 foot lengths of PVC wire <br /> wrap screen. In order to maximize well efficiency, the sand filter pack size and PVC wire wrap <br /> screen opening width will be determined by sieve analysis of core samples. A sand filter pack will <br /> be installed in the annulus between the screen and borehole wall from approximately 90 feet bls to <br /> 108 feet bks. A layer of 1/4 inch bentonite pellets will be placed on top of the filter pack after airlift <br /> development of the well. The remainder of the annulus will be filled with a bentonite grout such <br /> as Volclay. The wells will be equipped with electric submersible pumps capable of producing 40 <br /> to 70 gallons per minute (gpm). <br /> princed.,recycled paper <br />