My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
1624
>
2900 - Site Mitigation Program
>
PR0009012
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 10:03:55 PM
Creation date
11/1/2018 11:57:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009012
PE
2960
FACILITY_ID
FA0004532
FACILITY_NAME
FRMR KEARNEY-KPF FACILITY
STREET_NUMBER
1624
Direction
E
STREET_NAME
ALPINE
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
11708006-09
CURRENT_STATUS
01
SITE_LOCATION
1624 E ALPINE AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
555
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KI-4 Q S S A <br /> KI-5 Q 5,3 S3 A3 <br /> KI-6 Q B B B <br /> KI-8 Q S A A <br /> KI-12 Q S3 A3 A3 <br /> Lower Intermediate Zone Monitor Wells (continued). <br /> KI-16* Q S* S* A* <br /> KI-17* Q S* S* A* <br /> KPU-5 Q S A A <br /> PX-1 Q B B B <br /> Deep Zone Monitor Wells <br /> DMW-1 Q <br /> KD-I QMB B <br /> KD-4 Q B <br /> KD-5 Q A <br /> KD-6 Q B <br /> INJ-15 Q <br /> Production Well <br /> SPW-1 Q <br /> New Wells <br /> Q S4 A4 A4 <br /> Key: <br /> * These wells may be sampled semiannually only after one year of quarterly monitoring is completed. <br /> 1 Stabilized field parameter measurements must be obtained each time a well is sampled. <br /> 2 Required analytical method for VOCs shall be either USEPA Method 8260B or 802113 and shall include <br /> analysis for 1,4-dioxane,when required. The maximum detection limits must meet the limits listed in <br /> Table 2 and as described in EPA SW-846. <br /> 3 These wells are sampled quarterly if used for extraction or injection. See MRP 5-01-269,Revision 1. <br /> 4 Any wells installed after the issuance of this MRP shall be sampled quarterly for one year. <br /> 5 These wells are not required to be sampled if being actively used for injection and shall follow <br /> MRP 5-01-269,Revision 1 if used as injection wells. <br /> A Annual sampling shall be conducted from I October to 30 October of each year. <br /> B Bi-annual sampling shall be conducted during the fourth quarter of odd numbered years(2003, 2005,etc.). <br /> Q Quarterly water levels(15 January to 15 February, 15 April to 15 May, 1 July to 30 July,and 1 October to <br /> 30 October). <br /> S Semi-annual sampling shall be conducted during the second and fourth quarters. <br />
The URL can be used to link to this page
Your browser does not support the video tag.