Laserfiche WebLink
Doug O'Neal • • <br /> March 19, 2002 <br /> Page 3 <br /> • The Workplan (Page 6) states that the well completion report will be submitted as an <br /> addendum to the first quarter 2002 groundwater monitoring report. The facility should <br /> submit a stand-alone report of results for the subsurface investigation and well completion. <br /> The report should include the items identified in DTSC (2002)_ In addition, the report should <br /> provide an updated conceptual hydrogeologic model for the facility based on the lithologic <br /> data collected under the Workplan. This conceptual model should include an estimated <br /> extent of the channel sand encountered in wells PX-1, KEW-31-11, KI-5, KEW-4U, KI-12, and <br /> the new wells (if present). <br /> REFERENCES <br /> CVRWQCB, 2002, Comments on Draft Work Plan_ Installation of Monitor Wells South of KI-12, <br /> Former Kearney-KPF Facility, 1624 East Alpine Avenue, Stockton, CA. February 13, 2002. <br /> DTSC. 2002. GSU Comments on Draft Work Plan: Installation of Monitor Wells South of Kl- <br /> 12, Former Keamey-KPF Facility, 1624 East Alpine Avenue, Stockton, CA. February 7, <br /> 2002. <br />