My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
2200 - Hazardous Waste Program
>
PR0220082
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 2:12:46 PM
Creation date
11/1/2018 12:04:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0220082
PE
2220
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\L\LOUISE\500\PR0220082\COMPLIANCE INFO 1989 - 1992.PDF
QuestysFileName
COMPLIANCE INFO 1989 - 1992
QuestysRecordDate
9/22/2017 9:10:01 PM
QuestysRecordID
3256138
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
954
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
¢� Document Number: 909 R 5003 Document Number: 909 R 5003 <br /> Procedure Rev: 12 Date: 1122/13 Procedure Rev: 12 Date: 1/22/13 <br /> EMERGENCY RESPONSE PROCEDURES EMERGENCY RESPONSE PROCEDURES <br /> 2. Furnace—The primary concerns in the Furnace Department are the furnaces • That employees and/or Contractors are properly trained and knowledgeable in <br /> themselves. When a power failure occurs,the furnace roof-lift should enable on emergency response procedures. <br /> its own. If the roof-lift did not enable,then the roof of the furnace should be . That the facility is properly supplied and prepared for an emergency response. <br /> raised manually. Once the roof is up,the furnace employees should make sure . That effective communication exists and is maintained with outside response <br /> that the rolls of the furnace are still turning and that there is no more glass being agencies. <br /> fed into the furnace. Since the power is out,and the generator is used for <br /> emergency lighting and to keep the furnace rolls turning,power to the press rolls NOTIFICATION <br /> will likely be lost. Furnace employees should prepare the push-sticks to begin <br /> pushing glass out of the furnace. GLASS SHOULD NOT BE LEFT TO PILEUP The following notification procedures shall be used in the event of a fire. Upon <br /> IN THE FURNACE! Once the furnace has been emptied,furnace employees receiving notification,Security shall solicit from the employee and/or Contractor: <br /> should await the word of the Team Leaders before starting the line once the <br /> power has been restored. The type of emergency <br /> Location and phone extension <br /> 3. Maintenance—The Maintenance Department has numerous duties in the event . If any employees and/or Contractors are injured and extent of <br /> of a power failure. One of the first priorities is to check the generator to make injuries <br /> sure that it is running properly. Meanwhile,the origin of the power outage should Name of person reporting emergency <br /> be determined. Once the origin of the power outage has been found, <br /> Maintenance should contact the necessary people to begin the power restoration Once security is notified,they shall determine the severity of the emergency. <br /> process. After the power has been turned back on,Maintenance personnel are <br /> to manually restart the compressors to get the R.O.system functioning again. LEVEL 1 -Fire that involves single use of fire extinguisher or small localized <br /> When this process is complete,Maintenance is to contact the Team Leaders, fire burning(i.e.trash can,small piece of equipment etc.) No personal injury <br /> who will in turn contact the operators to begin the start-up process. involved-NO 911 response required. <br /> Level I requires notification to the EHS Manager, area manager, and <br /> supervisor. <br /> FIRE LEVEL II-Fire that involves multiple-use fire extinguisher,involves structure, <br /> PURPOSE grass or brush fire,glass leak or any fuel sources(gasoline,propane solvents, <br /> oils etc..) Can include personal injury-411 Response required. <br /> To facilitate the orderly and proper response to a fire or related incident within the Level II requires notification to: <br /> facility and to ensure that the safety and health of employees and/or Contractors is <br /> not compromised. . Lathrop-Manteca Fire District <br /> • Plant Manager <br /> OIIJECIIVES . EHS Manager <br /> . To ensure a safe and proper response to an incident • Human Resources Manager <br /> a Area Managers <br /> Document in and SettingallttranlLocal SettingslTemporary Intcmet Files\Content.Outlook\JQ9W31 RYVCAPA DOCLLmenl in and Setting5ltttran\Loca➢SettingslTemporary Internet FileslContent.Out1ook1rQ9W31RIVCAPA <br /> CCR 66265 55.doc Page 45 of 69 CCR 66265 55.doc Page 46 of 69 <br /> Paper Caples ere Not Controlled unless stamped In RED-Controlled Dmumenr.Controlled Version appears In 459000 database. Paper Copies am Not ContreRed unless stamped In RED"Controlled Document.Controlled Versim appears In 059000 database. <br /> Copies.1houl a RED"C.t'olled❑etum w.iamp raU be OBSOLETE 24 hours from 61118014 1'57 PM Cop—with-1,a RED"Controlled Oecumsnt'stamp Wlil be OBSOLETE 24 hours tram 13111!1014 1'67 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.