Laserfiche WebLink
DEC-10-2007 MON 06:25 PM 0&0 FAH N0, 0000ft P, 04 <br /> Print work order cards <br /> Work order 53935 ManMy OWS Throughputl.og ylspocwn Targetdate 01-JAW2011 <br /> Pepr)m <br /> Stews Released <br /> Parent work order WD type PM Class <br /> [)apartment DEFAULT/ALL DEPARTW.NTS Priority <br /> PM schedule SNOWS-M a Monthly OWS Throughput Log Inspection Warranty <br /> Cost code Safety <br /> Problem code Equipment <br /> criticRequested by Asglry <br /> esignad to OPERATOR <br /> Project <br /> Schsduling group <br /> Standard work order <br /> Equipment STOCKTON STATION STOCKTON STATION <br /> (BRAOSHAW) <br /> Location STOCKTON STATION STOCKTON STATION <br /> (BRADSHAW) <br /> Manufacturer <br /> Model <br /> Serial number <br /> Date started Defy completed Time comPlehud <br /> Activity 10 MonthlyOWS Throughput Log <br /> Work order 53935 Activity 10 To Feet date 01-JAN-200b <br /> Trede OPER OPERATIONS Duration(days) 1 <br /> EaSmslad hours I People req 1 <br /> Act Schedule <br /> Person responsible Description Staritlme Hours <br /> Booked hours <br /> Employee Date Tlrns on Time oh Total lime Tariff group <br /> A <br /> / tiβœ“ I I <br /> Mmsrks <br /> C ' β€’ I <br /> UJ <br /> Instruction flat 511I.OWS-TR 0 Work order 53935 Activity 10 <br /> M <br /> 10-Nbindain monthly be of total volume of liquids handled by the OWS on sse for poseetp SJVAPCD inspection <br /> 20-Verify all lids or hatches are cbsad,except.hen In use. <br /> 30-provide nomhly throughput log w ERS Al Group(Erb Coned) <br /> _...... .. ......large. . saga 1 r 2 <br /> 06-JAN-2006 09:32 Kind.lbrgan <br />