Laserfiche WebLink
`. ..i <br /> Mr. Trevena and I discussed the need for specific documentation of personnel <br /> records as outlined in Title 22. Mr. Kyle stated he thought the Seattle office would <br /> have the required information, and he would be contacting them to obtain the lacking <br /> paperwork. <br /> At the conclusion of the inspection, we explained to Mr. Kyle that a cursory review <br /> of the 1992 manifests indicated their hazardous waste tonnage already exceeded the <br /> amount generated in 1991, and because of this fact it would be reasonable to assume <br /> TOC would be considered a large quantity generator for 1992 as well. With the <br /> inspection completed, Mr. Trevena and I left the premises. <br /> X. ADDENDUM: <br /> On September 15, 1992, I telephoned TOC and spoke with Mr.A] Bieniecki. I asked <br /> him questions pertaining to TOC necessary to complete the hazardous waste <br /> generator report. <br /> 1 <br />